Place Pump - The pump must be installed so that the flapper valves will open and close. The drawings
below show how the pump can and can not be installed in relationship to its’ horizontal and vertical axis.
Inlet
Inlet
Inlet
Discharge
Discharge
OK OK
OK
Discharge
Discharge
Discharge
Inlet
Inlet
Inlet
Vertial Axis
Discharge
Discharge
Inlet
Horizontal Axis
Discharge
Inlet
Page 3 Installation
Installation Guidelines
P-120A -01 pg. 3
Step 1
Check All Bolts - Make sure that all bolts on the pump are tight. Tools: 2ea. 9/16”, 1/2” and
7/16” Box Wrenches.
7/16”
1/2”
9/16”
Step 2
Install Stainless Steel Handle - ( Cart Mounted Pumps Only ) Remove spacers & replace with
handle.
7/16”
Stainless Steel Handle