Installing the SwitchAir
1.
Attach Rear Air Channel to the Side Air
Channel for rear air intake switches only.
Discard for side air intake switches.
2.
Place cage nuts in all four channel
mounting holes. Attach Channel to
inside of front rail using screws at top
and bottom cage nuts positions (rack rail
cage nuts and screws not included).
3.
Attach SwitchAir Wipers to the sides of
the SwitchAir Chassis using the screws
provided. Do not install Wipers for
network switches with rear air intake.
4.
Connect to power before attaching
SwitchAir Chassis to rack front. Slide
the SwitchAir Chassis into the SwitchAir
Channels from the front of the rack.
Attach the SwitchAir Chassis using four
screws (not included).
Ver: EDPSA2002IG1118.1
ü
www.edpeurope.com
Å
+44 (0)1376 510337