6
1.
PRODUCT INSTALLATION
I.
Install the switch on a level surface that can support the
weight of the unit and the relevant components, and attach
the rubber feet to the bottom. The rubber feet cushion the
switch and helps protect the case from scratches.
II.
Plug the switch into an electrical source with the provided power
cord.
Regarding the installation environment, we strongly recommend:
1.
The switch should be placed in an appropriately ventilation
environment. A minimum 25 mm space around the unit is
recommended.
2.
The switch and the relevant components should be kept away from
sources of electrical noise such as radios, transmitters and
broadband amplifiers.
3.
Avoid environments with higher than recommended moisture levels.
Troubleshooting
1.
Power LED is not lit
Check if the power cord is properly connected to the plug and the
power outlet; make sure the power cord is firmly plugged into the
power socket of the switch.
2.
LINK/ACT LED is not lit when connected to devices
Make sure the network device attached to the switch is turned on.
Make sure the network cable is properly connected to the switch
and the network device.
Make sure the network cable is a UTP cable that complies with
EIA/TIA 568 and Category 5 specifications.
[!] Contact your dealer if problem persist.