background image

5

5

Installation

1. Operating Environment

ER-5398S must be installed and operated within the limits of specified operating
temperature and humidity (see previous section under Specifications). Do not place
objects on top of the unit. Do not obstruct any vents at the sides of the unit. Do not
position the hub near any heating source such as heater, radiator, or direct exposure
to sun. Prevent entering of water and moisture into the unit. If necessary, use
dehumidifier to reduce humidity.

2. Connecting to network devices with UTP cable

Connect one end of the network cable to any of the RJ-45 ports on the front panel of
ER-5398S, and connect the other end of the network cable to the RJ-45 port of the
network device. The network cables must comply with EIA/TIA 568 specifications
and minimum Category 3 standard for 10Mbps data transmission.   Maximum length
between the hub and workstation is 100 meters (300ft).  Once the network cable is
connected on both ends and the attached network devices are powered on, the green
LNK/Rx (Link Status) LED should be lit.

3. Uplink to Another Hub with UTP cable

Use uplink port to connect to another hub as illustrated in Figure 1-2. Connect one
end of the network cable to the uplink port and connect the other end to any of the
regular port in the other hub (except the uplink port).  Connecting cable must comply
with EIA/TIA 568 specifications and Category 3 standards to connect the hubs.
Once the network cable is connected and both hubs are powered on, the green
LNK/Rx (Link Status) LED should be lit. The maximum length of the uplink cable
shall not exceed 100 meters (300 feet).

NOTE: Do not use the uplink port and 16th port at the same time.

6

Figure 5-1  Connect the hub and network device

100m

10/100 FAST ETHERNET CARD
FCC ID :

RTL8139

Category 3

EIA/TIA 568

UTP Cable

Network
Adapter

LA

P R

O FE SSI

18

 

PORT/10 Mbps

 

ER-5398

10

 

BaseT

 

Ethernet

1

3

5

7

9

Link/Rx

Partition

Collision

Jabber

Power

2

4

6

8

10

12

14

16

11

13

15

1X

2X

3X

4X

5X

6X

7X

8X

13X

14X

15X 16MDI-X

9X

10X

11X 12X

16MDI

D I M A X

Summary of Contents for ER-5398S

Page 1: ...DIMAX Ethernet Hub ER 5398S 18 Port Rackmount Ethernet Hub User s Manual S S L A N P R O F E I O N A L...

Page 2: ...tion If you suspect this equipment is causing interference turn your hub on and off while your radio or TV is showing interference to determine the source of the interference You can try to correct th...

Page 3: ...Chapter 1 Introduction 1 Chapter 2 Features Specifications 2 Chapter 3 Package Contents 3 Chapter 4 Physical Description 4 Chapter 5 Installation 6 Chapter 6 Trouble shooting 9 Contents...

Page 4: ...y as stand alone or distributed workgroup wiring center 1 Figure 1 2 Uplink to another hub Figure 1 1 ER 5398S Topology 1X 2X 3X 4X 5X 6X 7X 8X 13X 14X 15X 16MDI X 9X 10X 11X 12X 16MDI R O F E SS 18PO...

Page 5: ...rough cable n Complete sets of LEDs provide an easy diagnostic on the hub s and individual port s status n Standard 19 rackmount n Two year warranty 2 Specification n Standards IEEE 802 3 n 10Mbps Por...

Page 6: ...ors n Rackmount accessories n User s manual 3 Figure 3 1 Package contents 1X 2X 3X 4X 5X 6X 7X 8X 13X 14X 15X 16MDI X 9X 10X 11X 12X 16MDI L P R O F E S S 18 PORT 10 Mbps ER 5398 10BaseT Ethernet 1 3...

Page 7: ...DIMAX 1 2 3 4 ON BNC 1 BNC 2 AUI 1 AUI 2 Power 100 240VAC 1A L A N P R O F E S S I O N L 18 PORT 10 Mbps ER 5398 10BaseT Ethernet 1 3 5 7 9 Link Rx Partition Collision Jabber Power 2 4 6 8 10 12 14 16...

Page 8: ...Off Lit Off Flash Lit Off Power is supplied No power A valid link is established Data packets received No link is established This port is patitioned This port is working normally Collision detected...

Page 9: ...e network cable is connected on both ends and the attached network devices are powered on the green LNK Rx Link Status LED should be lit 3 Uplink to Another Hub with UTP cable Use uplink port to conne...

Page 10: ...ure 5 3 If the ER 5398S is at either end of the coaxial segment make sure terminate the open end of T connector with a 50 ohm terminator When using the AUI port firmly attach the AUI transceiver to th...

Page 11: ...the power socket on the rear panel of the unit Connect the power cord to the power outlet and turn on power switch The green Power LED on the front panel should be lit Figure 5 5 Connect the power 1 2...

Page 12: ...rkstation 3 Uplink 16th port s LNK Rx LED is not lit after uplink to another hub l Check the network cable make sure it is properly connected to both hubs One end of the cable should be connected to u...

Page 13: ...e network cables connect the cables back one by one to isolate the source of the collision l Check the network cable inferior cable quality will result in excessive collision and error packets 7 Jabbl...

Reviews: