
– 7 –
Figures
Figure 1: Front Panel ECS3510-26P
10
11
Figure 3: Installing the Switch in a Rack
15
Figure 4: Connecting AC Power
16
17
17
Figure 7: Making a Connection to an SFP Port
18
Figure 8: Attaching the Brackets
21
Figure 9: Installing the Switch in a Rack
21
Figure 10: Attaching the Adhesive Feet
23
Figure 12: AC Power Supply Socket
25
Figure 13: Grounding Terminal
26
Figure 14: AC Power Cord and Power Socket
27
31
Figure 16: Inserting an SFP Transceiver into a Slot
33
35
Figure 18: Making Twisted-Pair Connections
37
Figure 19: Making a Connection to an SFP Port
39
Figure 20: System Status LEDs
42
43
Figure 22: Console Port Connection
44
45
Summary of Contents for ECS3510-26P
Page 1: ...Installation Guide www edge core com ECS3510 26P 26 Port Layer 2 Gigabit Ethernet Switch ...
Page 13: ...Chapter 1 Switch Description Key Technical Specifications 13 ...
Page 24: ...Chapter 3 Switch Chassis Switch Cooling Requirements 24 ...
Page 28: ...Chapter 4 Power and Grounding How to Connect to AC Power 28 ...