
C
HAPTER
3
| Installing the Switch
Mounting
– 44 –
M
OUNTING
The switch can be mounted in a standard 19-inch equipment rack, wall
mounted, or on a desktop or shelf. Mounting instructions for each type of site
follow.
R
ACK
-M
OUNTING
Before rack mounting the switch, pay particular attention to the following
factors:
◆
Temperature: Since the temperature within a rack assembly may be higher
than the ambient room temperature, check that the rack-environment
temperature is within the specified operating temperature range. (
“Physical
Characteristics” on page 63
.)
◆
Mechanical Loading: Do not place any equipment on top of the rack-
mounted unit.
◆
Circuit Overloading: Be sure that the supply circuit to the rack assembly is
not overloaded.
◆
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than direct
connections to the mains.
Figure 13: Grounding
1.
Attach an insulated
grounding wire with the
screw onto the grounding
point.
2.
Terminate the wire to
an earthed grounding
point.
Summary of Contents for ECS2000-10P
Page 1: ...Installation Guide www edge core com ECS2000 10P 10 Port Layer 2 Gigabit Ethernet PoE Switch...
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Page 20: ...CONTENTS 20...
Page 22: ...TABLES 22...
Page 24: ...FIGURES 24...
Page 32: ...CHAPTER 1 Introduction Description of Hardware 32...
Page 40: ...CHAPTER 2 Network Planning Application Notes 40...
Page 50: ...CHAPTER 3 Installing the Switch Installing an Optional SFP Transceiver 50...
Page 60: ...CHAPTER 4 Making Network Connections Cable Labeling and Connection Records 60...
Page 67: ......