
C
HAPTER
3
| Installing the Switch
Equipment Checklist
– 43 –
E
QUIPMENT
C
HECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
◆
L2 Edge 10-Port GE PoE Switch
◆
Four adhesive foot pads
◆
Grounding screw
◆
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
◆
Power Cord
◆
This Installation Guide
◆
Documentation CD (Includes Management Guide)
O
PTIONAL
R
ACK
-M
OUNTING
E
QUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
◆
Four mounting screws for each device you plan to install in a rack—these
are not included
◆
A screwdriver (Phillips or flathead, depending on the type of screws used)
Summary of Contents for ECS2000-10P
Page 1: ...Installation Guide www edge core com ECS2000 10P 10 Port Layer 2 Gigabit Ethernet PoE Switch...
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Page 20: ...CONTENTS 20...
Page 22: ...TABLES 22...
Page 24: ...FIGURES 24...
Page 32: ...CHAPTER 1 Introduction Description of Hardware 32...
Page 40: ...CHAPTER 2 Network Planning Application Notes 40...
Page 50: ...CHAPTER 3 Installing the Switch Installing an Optional SFP Transceiver 50...
Page 60: ...CHAPTER 4 Making Network Connections Cable Labeling and Connection Records 60...
Page 67: ......