Step 1
Don’t forget to check your work with a level as you go!
Page 2 of 8
www.eDecks.co.uk
All images are for illustration only, Please see individual item listings for actual item specifications
Align the first newel post (95mm notched
post A) with the edge of the bottom step.
Rest the notch on top of the step.
Secure into the side of the step stringer with
4 x 75mm screws as shown in diagram
opposite.
Step 2
Align the second newel post (180mm
notched post B) with the front edge of
the top step.
Secure into the side of the step stringer
with 4 x 75mm screws.
If assembling an 11 or 12 step kit, you
will have an additional newel post (A) to
sit in between posts (A) and (B).
4x 75mm Screws
A
F
4x 75mm Screws
B
F
Step Stringer Handrail Fitting Instructions