Printed in USA
TVW
©2009
Page 17
E-CPM-4-8-10-SL8-I-0309
100 Thomas Johnson Drive, Frederick, MD 21702-4600 USA
Phone (301) 663-1600 • 1-800-638-3326
Fax (301) 663-1607 • 1-800-447-3326
Website: www.edcoinc.com
Email: [email protected]
Jacking Bolt
Never work on or under equipment without fi rst securing the equipment to prevent it from mov-
ing or falling. Always work on a fl at and level surface.
Refer to the Engine/Motor Manufacturer’s Owner’s Manual
for maintenance information specifi c to the engine/motor used.
Grease cutter assembly bearings (2 ea)
after every 4 hours of use.
IMPORTANT!
Remove spark plug lead on gasoline/propane engine models
or disconnect the supply voltage connector on
electric models before performing any maintenance.
Disconnect the power cord at the machine.
Maintenance Instructions
Cutter Assembly
Bearings (2)
Grease Depth Control grease
point every 40 hours.
Depth Control
Grease point all
models except
ScariLite-8.
Bearing
CPM 8,10,
CPM 4
Cutter assembly
bearings (2)
ScariLite-8
Wheel
Depth Control
Multi Vac Port