
2 - 2
Turning the SM-4000 On and Off
Note
:
T
HE BATTERY MUST BE FULLY CHARGED
before each use. See page
Introduction
5-8 for information on battery maintenance.
Power-On
Press the
ON/OFF
key to turn the Haz-Dust SM-4000 monitor on.
Result:
The unit will turn on and the Title Screen will appear.
Note:
Before taking a sample fully charge battery for 16 hour and allow
monitor to run for at least two minutes for the Haz-DustSM-4000 to
equilibrate and stabilize. Then perform an auto zero to set baseline. See
section 3-6 for detailed procedure.
Power-Off
Press the
ON/OFF
key a second time to turn the Haz-Dust SM-4000 off.
Summary of Contents for Haz-Dust SM-4000
Page 2: ...EDC SM 4000 User s Guide New technology for monitoring air quality E c...
Page 3: ......
Page 8: ...vi Chapter 1 Introduction to the SM 4000...
Page 10: ...viii Figure 1 1 Picture of the Haz Dust SM 4000...
Page 11: ......
Page 19: ...Chapter 2 Operating Parameters of the Haz Dust SM 4000...
Page 20: ......
Page 24: ...2 4 Figure 2 3 The Main Menu of the Haz Dust SM 4000...
Page 28: ...Chapter 3 Operating the Haz Dust SM 4000...
Page 42: ......
Page 43: ...Chapter 4 DustComm Pro V2 3 1...
Page 62: ...Chapter 5 Maintenance...
Page 72: ...5 10 Continued on next page Error No text of specified style in document Continued...
Page 77: ...Appendix...
Page 78: ......