Page.8.
Notice:
Press
the
key several seconds to restore the default settings when the
instrument
works
abnormally.
Multi-meter:
the
red
and
black
multi-meter
pen
must
insert
the
corresponding
port.
Warnings:
Instrument
communication
port
is
not
permitted
access
circuit
voltage
over
6V,
otherwise
damage
the
tester.
Warnings:
Not
allow
insert
multi-meter
pen
in
the
current
terminal
to
measure
voltage.
3.2
Instrument connection
3.2.1 IP camera connection
Power an IP camera with an independent power supply, then connect the IP camera to the IPC tester's
LAN port, if the link indicator of the tester's LAN port is green and the data indicator flickers, it means
the IP camera and the IPC tester are communicating. If the two indicators don't flicker, check if the IP
camera is powered on or the network cable is not functioning properly.
Note:
1) If the IP camera
requires
PoE power,
then
connect
the
IP
camera
to
the
IP
tester's
LAN
port
.
The tester will supply PoE Power for the IP camera. Click the icon POE to turn the PoE Power off or on.
Schmidt and Muller Telecommunications Pty Ltd trading as ELECTROCRAFT AUSTRALIA - ABN 79 067 000 426