17
ALTERNATE POSITIONS
TOP
TOP
DRAFT REGULATOR
VANE
CRIMPED END
BALANCED WEIGHT
DRAWBAND
LAST PIECE
INSTALLED
MUST SLOPE UP
AT LEAST 1/4 INCH
PER FOOT OF
HORIZONTAL RUN
MUST BE AT LEAST 4
INCHES THICK -
AND BE TIGHT.
TIGHT
CLEAN-OUT
DOOR
SEALED IN
THIMBLE
TIGHT, SMOOTH,
CORRECTLY SIZED.
Minimum Height:
Must be 3 FT higher than
highest part of passage through roof.
Must be at least 2 FT higher than
any neighboring object within 10 FT.
Must have unobstructed top opening
.
TYPICAL CHIMNEY CONNECTION
CHIMNEY AND CHIMNEY CONNECTIONS
WARNING
Fire Hazard. Maintain minimum vent pipe clearance of
9” from surface of vent to wood and other combustible
materials. Failure to comply may result in death or
serious injury.
!
Figure 12 -Typical Chimney Connection
Chimney Connector And Draft Regulator
• Venting the boiler requires 6” diameter chimney
connector pipe and use of manufacturer provided draft
regulator.
•
Regulator, when properly installed, automatically
controls the draft.
•
Install in horizontal section of pipe, may also be
installed in angled or vertical section of pipe.
• Verify “top” of regulator is at the top and short pipe
section which holds the vane is horizontal.
• Even though locating draft regulator close to chimney
reduces noise,
install draft regulator as close as
practicable to the boiler.
•
Install chimney connector, start at boiler with vertical
pipe, elbow, then install draft regulator horizontally.
•
When regulator is in place, start at chimney and work
back to the regulator.
•
Join the two sections with draw-band.
•
Horizontal pipe must slope up toward the chimney at
least 1/4 inch per linear foot of venting.
•
Chimney connector must not leak and must be firmly
supported.
•
Join each section with at least two sheet metal screws.
Support every second section with a stovepipe wire.
PN 240013023, Rev. B [12/31/2020]