ELECTRICAL WIRING
Electrical Wiring
See wiring diagram Figure 12, Page 23 for details.
Refer to Ladder Diagram from document envelope
received with boiler.
Electrically bond boiler to ground in accordance with
requirements of authority having jurisdiction. Refer to
National Electrical Code, ANSI/NFPA 70.
If any of the original wire as supplied with this appliance
must be replaced, it must be replaced with type 105°C
thermoplastic wire or its equivalent
Circulator harness is factory wired to control module.
Connect harness to circulator in
fi
eld. See Figure 11 .
WARNING
Electrical shock hazard. Turn OFF electrical power
supply at service panel before making electrical
connections. Failure to do so could result in death
or serious injury.
!
Thermostat Installation
1.
Thermostat should be installed on an inside wall about
four feet above the
fl
oor.
2.
NEVER install a thermostat on an outside wall.
3.
Do not install a thermostat where it will be affected
by drafts, hot or cold pipes, sunlight, lighting
fi
xtures,
televisions, a
fi
replace, or a chimney.
4.
Check thermostat operation by raising and lowering
thermostat setting as required to start and stop the
burners.
5.
Instructions for the
fi
nal adjustment of the thermostat
are packaged with the thermostat (adjusting heating
anticipator, calibration, etc.)
6.
Set heat anticipator at .2 amps. 24 volt thermostat
connects to yellow low voltage wires labled T.
Electric Power Supply
Run a separate 115 volt circuit from separate over current
protective device 15 ampere circuit in electrical service
entrance panel.
Connect 115 volt power supply to terminals L1 (HOT) and
L2 inside J box.
Run 14 gauge or heavier copper wire from boiler to
grounded connection in service panel or properly driven
and electrically grounded ground rod.
J BOX
L1 & L2
TRANSFORMER
THERMOSTAT WIRES
R
R
THE
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
L
L
L
L
L
CIRCULATOR
HARNESS
CI
CI
CI
CI
C
C
H
H
H
H
TRANSFORMER LINE VOLT
ER LINE VOLT
T
T
T
T
T
T
BLOWER
TRANSFORMER
SECONDARY
Figure 11 - Control Module Panel
Summary of Contents for UTICA BOILERS SVB II Series
Page 23: ...23 WIRING DIAGRAMS Figure 12 Control Module Damper is not an option ...
Page 37: ...Date Service Performed Company Name Tech Initials Company Address Phone ...
Page 38: ...NOTES ...
Page 39: ...Date Service Performed Company Name Tech Initials Company Address Phone ...
Page 40: ...UTICA BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...