6
1.
Installation must conform to the requirements of the
authority having jurisdiction or, in the absence of such
requirements, to the National Fuel Gas Code, ANSI
Z223.1/NFPA 54, and/or Natural Gas and Propane
Installation Code, CAN/CSA B149.1.
2.
Where required by the authority having jurisdiction, the
installation must conform to the Standard for Controls
and Safety Devices for Automatically
fi
red Boilers,
ANSI/ASME CSD-1.
3.
Boiler series is classi
fi
ed as a Category I. Vent
installation shall be in accordance with "Venting of
Equipment ," of the National Fuel Gas Code, ANSI
Z223.1/NFPA 54, or "Venting Systems and Air Supply
for Appliances," of the Natural Gas and Propane
Installation Code, CAN/CSA B149.1, or applicable
provisions of the local building codes.
4.
Boiler has met safe lighting and other performance
criteria with the gas manifold and control assembly on
the boiler per the latest revision of ANSI Z21.13/CGA
4.9.
5.
Install boiler such that gas ignition system components
are protected from water (dripping, spraying, rain,
etc.) during appliance operation and service, (circulator
replacement, condensate trap, control replacement,
etc.).
6.
Locate boiler on level, solid base as near chimney as
possible and centrally located with respect to heat
distribution system as practical.
7.
Allow 24 inches (610mm ) at front and right side for
servicing and cleaning.
8.
When installed in utility room, door should be wide
enough to allow largest boiler part to enter, or to
permit replacement of another appliance such as water
heater.
WARNING
Fire hazard. Do not install boiler on combustible
fl
ooring or carpeting. Failure to follow these
instructions could result in death or serious injury.
!
9.
FOR INSTALLATION ON NON-COMBUSTIBLE FLOORS
ONLY - For installation on combustible
fl
ooring special
base must be used. (See Repair Parts, Optional Kits
Manual). Do not install boiler on carpeting. Minimum
clearances to combustible construction are:
TOP ....................................18 IN. (457mm)
FRONT .........................................ALCOVE *
FLUE CONNECTOR ................. 6 IN. (152mm)
REAR ................................... 4 IN. (102mm)
CONTROL SIDE ..................... 9 IN. (229mm)
OTHER SIDE ........................... 3 IN. (76mm)
HOT WATER PIPING ................ Per Local Code
NOTE: Greater clearances for access should supersede fire
protection clearances.
* De
fi
nition of Alcove is three sided space with no wall in
front of boiler. ANSI standard for alcove is 18 inches from
front of appliance to leading edge of side walls as shown
below.
2 - INSTALLATION PROCEDURE
WARNING
Improper installation, adjustment, alteration, service
or maintenance could result in death or serious
injury
.
!
3"
4"
BOILER
18"
9"
Front
Minimum Clearances to Combustible Construction (as
seen from above)
Summary of Contents for Olsen OMGB II Series
Page 18: ...18 10 WIRING DIAGRAM Figure 14 Integrated High Limit Electronic Ignition Control 240008781 ...
Page 19: ...19 10 WIRING DIAGRAM Figure 15 Integrated High Limit Electronic Ignition Control 240008781 ...
Page 29: ...NOTES ...
Page 30: ...NOTES ...
Page 31: ...Date Service Performed Company Name Tech Initials Company Address Phone ...
Page 32: ...ECR International 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...