![ECR International UTICA BOILERS TRB4075 Installation, Operation & Maintenance Manual Download Page 53](http://html1.mh-extra.com/html/ecr-international/utica-boilers-trb4075/utica-boilers-trb4075_installation-operation-and-maintenance-manual_2356165053.webp)
53
Table 17 - Carlin (CHIMNEY VENT) Preliminary Burner Settings
Burner settings provided are for initial startup only. Final adjustments must be made using combustion test
instruments.
Table 17- CARLIN CHIMNEY VENT PRELIMINARY BURNER SETTINGS
Boiler
Model
Insertion
Depth
Firing
Rate
Combustion
Liner
Nozzle
Mfr.
Nozzle
Type
Pump
Pressure
[PSI]
Head Bar
Setting
Air Band
Setting
Rated
AFUE
Efficiency
[%]
4075
4.56"
0.75
OVAL
DELAVAN
0.60x60B
160
1
22%
87.0
4090
4.56"
0.90
OVAL
DELAVAN
0.75x70A
145
2
28%
86.0
5100
3.00"
1.00
NONE
HAGO
0.75x60B
175
0.75
35%
87.0
Timings
Pre-purge
15 seconds
Post-purge
15 seconds
Boiler
Model
Carlin Oil
Burner
Model
ECR Oil
Burner
Part
Number
4075
EZ-SELECT 240013299
4090
EZ-SELECT 240013299
5100
EZ-LF
240013304
17 - OIL BURNER, NOZZLE, & AIR SETTINGS
PN 240013278, Rev. A [12/31/2020]