15
Check Gas Supply
Gas pipe to boiler must be correct size for length of
•
run and total Btuh input of all gas utilization equipment
connected to it.
See Tables 6 and 7
•
for proper size.
Verify your gas line complies with local codes and gas
•
company requirements.
Connecting Gas Piping
- Gas Supply Pressure
Table 5
Pressure
Natural Gas
Propane Gas
Minimum
4” w.c.
10” w.c.
Maximum
10” w.c.
14” w.c.
Please check line pressure while unit is running.
- Natural Gas Piping Sizes
Table 6
Pipe Length
Pipe Capacity - BTU/Hr. Input
(1)
½”
¾”
1”
1¼”
20’
92,000
190,000
350,000
625,000
40’
63,000
130,000
245,000
445,000
60’
50,000
105,000
195,000
365,000
- Propane Gas Piping Sizes
Table 7
Pipe
Length
Pipe Capacity - BTU/Hr. Input
(1)
Copper Tubing
(2)
Iron Pipe
⅝
”
¾”
½”
¾”
20’
131,000
216,000
189,000
393,000
40’
90,000
145,000
129,000
267,000
60’
72,000
121,000
103,000
217,000
(1)
Includes Fittings
(2)
Outside Diameter
Refer to Figure 14 for general layout at boiler. Gas line
enters boiler through left side panel.
Boiler is equipped with ½” NPT connection on gas valve for
supply piping and ½” NPT ball valve for manual shut off.
Following rules apply:
Use only those piping materials and joining methods
1.
listed as acceptable by the authority having jurisdiction,
or in the absence of such requirements, National Fuel
Gas Code, ANSI Z223.1/NFPA 54.
Use pipe joint compound suitable for liquefi ed
2.
petroleum gas on male threads only.
Use ground joint unions.
3.
Install sediment trap upstream of gas controls.
4.
Use two pipe wrenches when making connection to
5.
gas valve to keep it from turning.
Install manual main shutoff valve in vertical pipe
6.
about 5 feet (1.5m) above fl oor outside boiler
jacket.
Tighten all joints securely.
7.
Propane gas connections made by licensed propane
8.
installer.
Two stage regulation used by licensed propane
9.
installer.
Propane installer to verify Propane gas piping.
10.
Recommend use ½” union suitable for natural and
11.
propane gas after ball valve to facilitate service on
unit.
Leak Check Gas Piping
Pressure test boiler and gas connection before placing
boiler in operation.
Pressure test over 1/2 psig (3.5 kPa). Disconnect boiler
•
and its individual gas shutoff valve from gas supply
system.
Pressure test at 1/2 psig (3.5 kPa) or less. Isolate boiler
•
from gas supply system by closing manual gas shutoff
valve.
Locate leakage using gas detector, noncorrosive
•
detection fl uid, or other leak detection method
acceptable to authority having jurisdiction. Do not
use matches, candles, open fl ames, or other methods
providing ignition source.
Correct leaks immediately and retest.
•
7 - GAS SUPPLY PIPING
- Gas Piping
Figure 14
Length of pipe or tubing should be measured from gas
meter or propane second stage regulator.