![ECR International PENNCO FSB 3 Series Installation, Operation & Maintenance Manual Download Page 2](http://html1.mh-extra.com/html/ecr-international/pennco-fsb-3-series/pennco-fsb-3-series_installation-operation-and-maintenance-manual_2356154002.webp)
2
TABLE OF CONTENTS
Safety Symbols & Warnings
The following de
fi
ned symbols are used throughout this
manual to notify the reader of potential hazards of varying
risk levels.
NOTICE
Used to address practices not related to personal
injury.
CAUTION
Indicates a hazardous situation which, if not avoided,
could result in minor or moderate injury.
!
!
WARNING
Indicates a hazardous situation which, if not avoided,
could result in death or serious injury.
!
DANGER
Indicates a hazardous situation which, if not avoided,
WILL result in death or serious injury
!
IMPORTANT: Read the following instructions
COMPLETELY before installing!!
KEEP THIS MANUAL NEAR BOILER
RETAIN FOR FUTURE REFERENCE
WARNING
Keep boiler area clear and free from combustible
materials, gasoline and other
fl
ammable vapors
and liquids.
DO NOT obstruct air openings to the boiler room.
Modi
fi
cation, substitution or elimination of factory
equipped, supplied or speci
fi
ed components may
result in personal injury or loss of life.
TO THE OWNER - Installation and service of this
boiler must be performed by a quali
fi
ed installer.
TO THE INSTALLER - Leave all instructions with
boiler for future reference.
When this product is installed in the
Commonwealth of Massachusetts the installation
must be performed by a Licensed Plumber or
Licensed Gas Fitter.
!
WARNING
Fire, explosion, asphyxiation and electrical shock
hazard. Improper installation could result in death
or serious injury. Read this manual and understand
all requirements before beginning installation.
!
Boiler Ratings & Capacities...................... 3
Dimensions ............................................. 4
Installation Procedure ............................. 5
Ventilation & Combustion Air .................. 6
Installation System Piping ...................... 7
Vent Installation ................................... 10
Horizontal Venting Instructions .......... 13
Optional Horizontal Venting Instruction 18
Gas supply Piping .................................. 19
Electrical Wiring .................................... 21
Sequence of Operation .......................... 22
Wiring Diagrams ................................... 23
Starting Your Boiler ............................... 24
Checking and Adjusting ......................... 26
Maintaining Your Boiler ......................... 28
Service Hints ......................................... 29
Equipment & Optional Accessories ........ 30
Appendix A - Control Module ................. 32
A.1 Installation Environment Considerations . 32
A.2 Electrical Connections .......................... 32
A.3 Adjusting Settings ............................... 32
A.4 Display .............................................. 32
A.5 Operation .......................................... 33
A.6 Boiler High Limit Temperature Controller 34
A.7 Troubleshooting .................................. 34
A.8 Troubleshooting Error Codes ................. 34
A.9 Intermittent Pilot ................................ 35
Summary of Contents for PENNCO FSB 3 Series
Page 23: ...23 WIRING DIAGRAMS Figure 12 Control Module Damper is not an option ...
Page 37: ...Date Service Performed Company Name Tech Initials Company Address Phone ...
Page 38: ...NOTES ...
Page 39: ...Date Service Performed Company Name Tech Initials Company Address Phone ...
Page 40: ...PENNCO BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...