![ECR International Dunkirk HELIX VX Installation, Operation & Maintenance Manual Download Page 8](http://html1.mh-extra.com/html/ecr-international/dunkirk-helix-vx/dunkirk-helix-vx_installation-operation-and-maintenance-manual_2356135008.webp)
8
FIGURE 3-1 Boiler Components (Viewed from Back of Boiler)
(2) VENT CONNECTOR
NOTE:
See Section 5-3
For Safety Relief
Valve Piping
Instructions
(3) COMBUSTION
AIR INLET
(28) SAFETY RELIEF VALVE
(31) WALL MOUNT
SUPPORT BRACKET
3 - COMPONENT LISTING
050/075/100/150/200
SIZE SHOWN
(32) GAS CONNECTION
FIGURE 3-2 Jacket Removal (Viewed from Bottom of
Boiler
Jacket Latch - Lift
latch to dis-engage
Bottom of Boiler
FIGURE 3-3 Jacket Removal (Viewed from Left Side
of Boiler
Disengage latch and
lift jacket up and off
jacket support
Jacket Support (Lip)
Jacket Latch
PN 240011342 Rev. E [05/31/2018]