![ECR International Dunkirk HELIX VX Installation, Operation & Maintenance Manual Download Page 20](http://html1.mh-extra.com/html/ecr-international/dunkirk-helix-vx/dunkirk-helix-vx_installation-operation-and-maintenance-manual_2356135020.webp)
20
FIGURE 5-8B Multiple Boilers Using Primary/Secondary Pumping
5 - HYDRONIC PIPING
PN 240011342 Rev. E [05/31/2018]
Closely spaced tees
in primary system loop
12"/305mm
Maximum
Separation
Up to 16
boilers
CH/System
Pump
System
Temperature
Sensor
Size common piping
per maximum heat
capacity of entire
system
Limit
length to
5' (1.6m)