background image

11

NACM/EACM

ROOM AIR CONDITIONER - SPLIT WALL-MOUNTED TYPE

2

3

4

1

1

2

2

3

4

5

6

7

8

9

CAUTION

When using the Vacuum Pump

Completely tighten the flare nuts, A, B, C, D, connect the 

manifold valve charge hose to a charge port of the packed valve 

on the gas pipe side.

Connect the charge hose connection to the vacuum pump.

Fully open the handle Lo of the manifold valve.

Operate the vacuum pump to evacuate. After starting 

evacuation, slightly loose the flare nut of the packed valve on 

the gas pipe side and check that the air is entering. (Operation 

noise of the vacuum pump changes and a compound meter 

indicates 0 instead of minus)

After the evacuation is complete, fully close the handle Lo of the 

manifold valve and stop the operation of the vacuum pump.

Make evacuation for 15 minutes and more and check

that the compound meter indicates -76cmHg(-1.0x105Pa).

Turn the stem of the packed valve B about 45O counterclockwise

for 6~7 seconds after the gas coming out, then tighten the 

flare nut again. Make sure the pressure display in the pressure 

indicator is a little higher than the atmosphere pressure.

Remove the charge hose from the Low pressure charge hose.

Fully open the packed valve stems B and A.

Securely tighten the cap of the packed valve. 

Safety and leakage check

Soap water method:

Apply a soap water or a liquid neutral detergent on the indoor 

unit connections and outdoor unit connections by a soft brush 

to check for leakage of the connecting points of the piping. If 

bubbles come out, it indicates that the pipes have leakage.

Leak detector

Use the leak detector to check for leakage.

Testrunning

Perform test operation after completing gas leak check at the 

flare nut connections and electrical safety check.

Check that all tubing and wiring have been properly connected.

Check that the gas and liquid side service valves are fully open.

Connect the power, press the ON/OFF button on the remote 

controller to turn the unit on.

Use the MODE button to select COOL, HEAT, AUTO and FAN to 

check if all the functions works well.

When the ambient temperature is too low (lower than 

17OC/62OF), the unit cannot be controlled by the remote 

controller to run at cooling mode, manual operation can 

be taken. Manual operation is used only when the remote 

controller is disable or maintenance necessary.

Hold the panel sides and lift the panel up to an angle until it 

remains fixed with a clicking sound.

Press the Manual control button to select the AUTO or COOL, 

the unit will operate under Forced AUTO or COOL mode (see 

User Manual for details).

The test operation should last about 30 minutes.

A: Lo packed valve B: Hi packed valve C and D are ends of indoor 

unit connection.

1

2

3

4

Summary of Contents for EACM

Page 1: ...AIR CONDITIONER SPLIT WALL MOUNTED TYPE Thank you for purchasing this ecox product Before using this machine please read this manual and retain it for future reference INSTALLATION MANUAL NACM EACM NACM EACM ...

Page 2: ...roper installation adjustment service or maintenance possibly resulting in fire electrical shock property damage personal injury or death Keep running condition your air conditioning performing at least every six months clean the filters coils and fans Keep in good working control systems such as the thermostat The comfort temperature is between 21 C and 23 C holding the temperature within this ra...

Page 3: ...ties or lack of experience and knowledge unless they have been givensupervisionorinstructionconcerninguseoftheappliance by persons responsible for their safety Children should be supervised to ensure that they do not play with the appliance All the pictures in the instructions are for explanation purposes only The actual shape should prevail The design and specifications are subject to change with...

Page 4: ...t perfect it will cause heat up or fire at the connection Wiring routing must be properly arranged so that control board cover is fixed properly If control board cover is not fixed perfectly it will overheat at connection point of terminal fire or electrical shock This equipment must be grounded and installed with ground leakage current breaker It may cause electrical shock if grounding is not per...

Page 5: ...Installation Plate Clip Anchor Self tapping Screw A ST3 9x2 5 Seal Fo r cooling heating models only Drain Joint Fo r cooling heating models only Connecting pipe Assembly Liquid sid e Ga sside Remote controlle r Φ6 35 1 4in Φ9 52 3 8in Φ9 52 3 8in Φ12 7 1 2in Φ16 5 8in Parts you must purchase The pipe size differ from appliance to appliance Consult the technician for the proper size 1 5 8 depending...

Page 6: ... otherwise stated Determine hole positions according to left and right side of the installation plate The hole center is obtained by measuring the distance as shown in the diagram above 1 OUTDOOR UNIT SETTLEMENT OF OUTDOOR UNIT If an awning is built over the unit to prevent direct sunsight or rain be careful that heat radiation from the condenser is not obstructed There should not be any animal or...

Page 7: ... individual branch circuit and single receptacle used only for this air conditioner must be available See the following table for suggested wire sizes and fuse specifications 5 7mm 0 2i n 0 3i n The wire size of power supply cord and interconnected wire and the current of the fuse or switch are determined by the maximum current indicated on the nameplate which located on the side panel of the unit...

Page 8: ...ection another proper drain hose is needed as there is only one drain hose offered by factory If choosing one side drainage connection make sure the drain hole on the other side is well plugged For 9k 12k models if choosing left hand or left back piping please choosing left side drainage connection The connection of the drain hose is supposed to be done by qualified installer in case of water le 1...

Page 9: ...vent the admission of wind If need suspending installation the installation bracket should accord with technique requirement in the installation bracket diagram The installation wall should be solid brick concrete or the same intensity construction or actions to reinforce damping supporting should be taken The connection between bracket and wall bracket and the air conditioner should be firm stabl...

Page 10: ...arts Connective pipe length will affect the capacity and energy efficiency of the unit The nominal efficiency is tested basing on the pipe length of 7 5m 25ft Air purging The indoor unit and tubing between the indoor and outdoor unit must be leak tested and evacuated to remove any noncondensables and moisture from the system Check that each tube both liquid and gas side tubes between the indoor an...

Page 11: ...lve Safety and leakage check Soap water method Apply a soap water or a liquid neutral detergent on the indoor unit connections and outdoor unit connections by a soft brush to check for leakage of the connecting points of the piping If bubbles come out it indicates that the pipes have leakage Leak detector Use the leak detector to check for leakage Testrunning Perform test operation after completin...

Page 12: ...AF_ECX_ING_NACM EACM_IM_141114 ...

Reviews: