
2
-
Read the instruction manual carefully
before commencing the installation
-
Installation should be completed
by a competent person
-
All electrical work to be completed
by a qualified electrician
-
Please dispose the package properly.
Towel Rail Installation
1. Drill
2. Screwdriver(s)
3. Spirit level
4. Cable cutters
5. Measuring tape
+ penc
JTB Electric Radiators
Installation and Operational Manual
Tools Required
to complete the installation