background image

EcoTec värmesystem AB, PO Box 2103, 

SE-511 02 Skene, Sweden

[email protected],  www.ecotec.net.

EcoTec has ISO 14001 environmental certification.

0712

Our corporate vision is simple: A local approach, satisfied customers anda concern for the 
environment. We work with authorised distributors who offer a full service. Our quality ap-
proach is based on high levels of technical skill and constant development. We manufacture 
burners with an output between 7 kW and 300 kW. We are confident that we can offer you 
the best products on the market and a reduction in your heating costs.

We regard pellets as today's fuel, not as the fuel of the future. The earth's resources are not 
unlimited and our environment will not withstand everything it is exposed to. For this reason 
it is important to invest in renewable, environmentally friendly, cheap sources of energy.
If you have any thoughts about our products, you are welcome to call, fax or write to us.

The green fire

Summary of Contents for MiniQ

Page 1: ...5 kW Mini Q r en laddpanna Pannan anv nds i system med en ackumulatortank N r solpaneler ansluts g rs det mot en ackumulator tank d r det av sol eller pelletspannan uppv rmda vattnet lagras Den kom vi...

Page 2: ...ulation cm 5 mineral wool Fuel type Wood pellets Max working pressure MPa 0 25 Max water temperature C 95 Chimney connection mm 130 130 A mm 480 480 B mm 855 855 C mm 845 895 D mm 905 955 E mm 380 380...

Page 3: ...in the accumulator tank EcoTec MiniQ holds just 55 litres of water ensur ing minimal losses during downtime 1 The boiler s rear plate 2 Drain valve 3 Riser connection 4 Chimney connection 5 Return wa...

Page 4: ...er The burner must be installed by an au thorised installation engineer to ensure optimum set up of the combustion process A correctly set up burner yields better economy and less impact on the enviro...

Page 5: ...mpanying flue brush into the tubes and use it to scrape off all the soot Brush soot off the boiler walls and any other areas where it may accumulate Finish by emptying the ash drawer into a non flamma...

Page 6: ...f 10 15 Pa in the boiler to achieve a good function The chimney should be at least 120 mm in diameter The flue pipe connection must have a damper Connection Pipe installation must be carried out in ac...

Page 7: ...ust always be connected to an expan sion vessel With an open system the volume must be 5 of the system volume and with a sealed system 10 Safety valve The system must always be fitted with a safety va...

Page 8: ...nd constant development We manufacture burners with an output between 7 kW and 300 kW We are confident that we can offer you the best products on the market and a reduction in your heating costs We re...

Reviews: