background image

 

 

Datei:1_EcoStar430F_9671080_Betriebsanleitung_EN_2001-07.doc 

Update: 2012-12-18, S. 24  

9671080

 

1/26 

W e reserv e the right to change ex ecution and construction!  

 

MEIKO Maschinenbau GmbH & Co. KG,  Englerstr. 3,  D-77652 Offenburg,  Tel.: +49/781/203-0,  Fax: +49/781/203-1121 

 

Operating Instructions

 

 

 

Glasswashing machine 

 

 

EcoStar 430 F

 

 

TRANSLATION OF THE "ORIGINAL OPERATING INSTRUCTIONS" 

The original operating instructions can be downloaded from: https://partnernet.meiko.de

 

 

 

 

 

 

Summary of Contents for 430f

Page 1: ...ange execution and construction MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating Instructions Glasswashing machine EcoStar 430 F TRANSLATION O...

Page 2: ...for the operation of the appliance 12 6 9 Instructions for the disposal of the packaging material 13 7 Settings for initial commissioning by the service engineer 13 7 1 Commissioning 13 8 Washing wit...

Page 3: ...lly and to use it properly It will also enable you to avoid repairs and the concomitant loss of productive work In the event of any damage caused by non observance of these operating instructions any...

Page 4: ...perating instructions must always be kept within easy reach 1 2 Name and address of the manufacturer Please address any queries technical problems etc directly to MEIKO Maschinenbau GmbH Co KG Englers...

Page 5: ...u to understand the installation s operation Warning of dangerous electrical current Warning hand injury No splashing water prohibits the use of a high pressure hose Danger of explosion indicates a po...

Page 6: ...the essential requirements of the following EC Directives harmonized standards national standards Par la pr sente nous certifions sous notre seule responsabilit la conformit du produit avec les exige...

Page 7: ...ronmental protection and in particular that they are familiar with the operating instructions as well as with the safety information provided in them CAUTION the installation is only operated in perfe...

Page 8: ...arrangements who have read and who observe the safety instructions who have read and who observe the Operating Instructions or the part applicable to the work to be carried out The machine operates wi...

Page 9: ...rations They must not attack the metal form any deposits and cause discoloration CAUTION Open the door very carefully during the programme cycle as otherwise wash water could splash out The tank heati...

Page 10: ...nstructions Observe transport instructions on the packing The appliance must be moved with great care Unpack the machine In order to ensure safe shipping the installation parts are placed on a special...

Page 11: ...ts for the electrical connection Work on the electrical part of the machine may only be undertaken by specialist personnel The customer must guarantee the following points relating to the connection T...

Page 12: ...appliance must not be used to transfer waste water from other sources into the drain This could result in corrosion and blockage A grease trap may be needed depending on the machine application When s...

Page 13: ...ith the steel scrap The plastic tensioning strap of plastic PP can be recycled 7 Settings for initial commissioning by the service engineer 7 1 Commissioning In order to avoid damage to the installati...

Page 14: ...be used without a thorough knowledge of the Operating Instructions Incorrect operation could result in injuries to personnel or damage to the appliance 8 1 Operating panel Key display Meaning Tank fi...

Page 15: ...of 2 ml l you have to add 22 ml detergent in case of a tank content of 11 l Post dosing after 5 programme cycles With a dosage of 2 ml l add similarly 22 ml Normally a dosing of approx 2 ml of deterg...

Page 16: ...times would have to be selected Short wash times with baskets which are not overloaded are much more economical 8 5 1 Start the wash cycle Program start key Place the items in the basket Place the bas...

Page 17: ...onary dishwashing machine The lid can be opened after the container has been removed from its position Re fill the container marked detergent if necessary External container The container is located n...

Page 18: ...nually CAUTION The machine switch cabinet and other electrical components must NOT be sprayed with a hose or a high pressure cleaner 10 5 Maintenance of stainless steel surfaces The appliance is made...

Page 19: ...ater jets reach the items to be cleaned out of differing directions Therefore an even cleaning result can be guaranteed The cleaning cycle is followed by the fresh water final rinse The items are rins...

Page 20: ...work on the open appliance it MUST be disconnected from the power supply The machine is to be switched off completely with the on site power disconnection device here Should any of the operational fau...

Page 21: ...oled down Contact a service engineer to clarify the cause for overheating Dosing unit for rinse aid does not function Please refer to the special operating instructions for the rinse aid dosing unit V...

Page 22: ...e Staff responsibilities for the installation s operation maintenance and repair must be clearly defined Any personnel undergoing training are only allowed to work on the dishwashing machine installat...

Page 23: ...e person conducting the maintenance or repair work Failure to observe these precautions can result in severe physical injury or damage to property CAUTION Before carrying out any maintenance and repai...

Page 24: ...ash arm hubs 3 Fresh water rinse Check flow water pressure Check rinsing system is complete and produces correct spray pattern Check that system is watertight 4 Housing and mounting parts Check housin...

Page 25: ...interaction of all functions 11 Test run Check results of test wash and rinse brief instruction for new personnel 16 Environmentally acceptable measures Disposal of the installation Each discarded app...

Page 26: ...EcoStar430F_9671080_Betriebsanleitung_EN_2001 07 doc Update 2012 12 18 S 24 9671080 26 26 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 Of...

Page 27: ...prochable function of the dosing unit a local flow pressure of at least 2 5 bar in front of the solenoid valve is required Setting into operation When actuating the filling or the final rinse several...

Page 28: ...Operating instructions Rinse aid dispenser Type N 6 2 0 0 5 1 1 5 2 2 5 3 3 5 4 4 5 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ml lift Rotations of setting screw...

Page 29: ...ans that the rinse aid dosing is affected by the number of pump rotations The corresponding electronical control is located in the pump housing It can be adjusted via the set screw accessible from the...

Page 30: ...the complete final rinse cycle This means that the detergent dosing is affected by the number of pump rotations The corresponding electronical control is located in the pump housing It can be adjuste...

Page 31: ...9683010 Max Min START CLEAN STOP EcoStar 430 F...

Page 32: ...OVERALL FUNCTIONS OF THE MACHINE ALL ARBITRARY PARAMETER ALTERATION PERFORMED BY AN UNAUTHORIZED PARTY WILL CAUSE THE WARRANTY TO BE VOID Parameter mode BT TT CD RT WH AV1 AV2 MT C C s s dH 50 40 60...

Page 33: ...uction pipe Tuyau d aspiration Tubo d aspirazione Tubo de aspiraci n Laugenpumpe Drain pump Pompe de vidange Pompa di scarico Bomba de vaciado Ablaufverrohrung mit Siphon bauseits Drain pipework with...

Page 34: ...ma z dala od r de ciep a LET OP Aanzuigleiding van warmtebronnen verwijderd houden 8 005 393 8 005 372 7 mm Deckel Reiniger bzw Klarsp lerbeh lter Lid for detergent resp rinse aid container Couvercle...

Page 35: ......

Page 36: ...f the following EC Directives harmonized standards national standards Par la pr sente nous certifions sous notre seule responsabilit la conformit du produit avec les exigences fondamentales des direct...

Reviews: