EcoQuest Fresh Air DuctwoRx Owner'S Manual Download Page 2

Replacement Parts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Installation Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Specifications  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
About EcoQuest’s RCI

 Technology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4

Recommended Installation Tools. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Installation Requirements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Metal Ductwork Installation  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Fiberglass Ductwork Installation  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Maintenance/UV Lamp Indicator  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  10
Disposal of the RCI

 Cell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  10

Warranty  .  

10

Changing the RCI

 Cell  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  11

CONTENTS

2

3

on your purchase of a Fresh Air DuctwoRx

 air purification enhancement system. 

This unit is designed to be installed into an existing HVAC system, and used as a 
virtually maintenance-free enhancement to EcoQuest’s air purification technology. 
Please read and follow all service procedures outlined in this manual. Use only 
genuine EcoQuest replacement parts available from your EcoQuest Dealer.

If you have any questions concerning this or any EcoQuest product, contact your 
EcoQuest Dealer.

Please record the name and phone of your EcoQuest Dealer: 
Name _________________________________________________________
Phone _________________________________________________________

Please record the serial number of your Fresh Air DuctwoRx

:

Serial # ________________________________________________________

CONGRATULATIONS . . .

REPLACEMENT PARTS

Base Unit
Item # N/A

Mounting Plate
Item # US70683

RCI Cell
Item # US70678

INSTALLATION HARDWARE

(8) #8 - .75
1/4” Self tapping screws
Item # US70679

(4) #6 - 32 X 2 inch
Threaded bolts
Item #US70680

(4) #6 - 32
Toggle bolt wall anchors
Item # US70682

(4) #8 - 32
Hex nuts
Item # US70681

This owner’s manual is also available online at:  http://www.ecoquest.com/ownersmanuals

PRODUCT CONTENTS

UV bulb 
indicator

Replaceable 
RCI

 Cell

Safety Switch

Mounting
Plate

Summary of Contents for Fresh Air DuctwoRx

Page 1: ...armful interference to radio or television which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is c...

Page 2: ...ilable from your EcoQuest Dealer If you have any questions concerning this or any EcoQuest product contact your EcoQuest Dealer Please record the name and phone of your EcoQuest Dealer Name _________________________________________________________ Phone_________________________________________________________ Please record the serial number of your Fresh Air DuctwoRx Serial _______________________...

Page 3: ...to oxygen and hydrogen after the oxidation of a pollutant Used in conjuction with other EcoQuest air purification systems Fresh Air DuctwoRx can boost effectiveness and help distribute their benefits throughout your home Installation Requirements 1 Unit should be installed after the air handler in the HVAC system 2 The duct work around the installation area should be clean and dry to insure proper...

Page 4: ...for 3 5 opening using either the mounting plate or included template a a Using template mark 4 holes on duct b b Drill 4 holes where marked c c Cut between holes using tin snips ALTERNATIVE CUTTING METHOD 4 4 Cut hole in duct using 3 5 hole saw 2 2 Cut away insulation to expose metal duct if needed ...

Page 5: ... ...

Page 6: ... into opening Be sure the air will pass though the RCI cell honeycomb matrix 9 9 Secure the unit to the mounting plate with 4 8 32 nuts 10 10 Plug unit into working power receptacle Hard wiring unit into HVAC system should be done by a licensed HVAC installer or electrical contractor only 7 7 Secure the mounting plate using 8 8 self tapping screws METAL DUCTWORK INSTALLATION CONTINUED ...

Page 7: ...Be sure toggle anchors open after inserting 8 8 Center large opening in mounting plate over 3 5 opening in duct and press plate to duct The adhesive gasket will hold the mounting plate into place Tighten toggle bolts DO NOT OVERTIGHTEN 9 9 Insert unit into opening Be sure the air will pass though the RCI cell honeycomb matrix 10 10 Secure the unit to the mounting plate with 4 8 32 nuts FIBERGLASS ...

Page 8: ...pply 9 9 Secure unit with 4 nuts 2 2 Remove the 4 mounting nuts 8 Insert the unit into the mounting plate 6 6 Plug the new RCI cell into the base unit 5 5 Separate the used RCI cell from the base unit and dispose of properly CHANGING THE RCI CELL EcoQuest International RCI Disposal 55 Marley Drive Greeneville TN 37743 MAINTENANCE UV LAMP INDICATOR Did you forget to register your Fresh Air DuctwoRx...

Reviews: