![Ecom J2KN Operation Manual Download Page 5](http://html.mh-extra.com/html/ecom/j2kn/j2kn_operation-manual_2354725005.webp)
Section 2
2.1 Getting Started
To begin analyzer operation, open the case by releasing the two latches located on the front of the
case, so that the top of the case opens upward to expose the top panel, display and keypad.
Carefully remove the hoses and cables from the top compartment of the case. Plug in the supplied
power cord to the back panel of the analyzer and to an appropriate power outlet. (The ECOM J2KN
will operate on 100 – 230 VAC) Make sure the Peltier Gas Cooler and Particulate filter assembly is
mounted properly on the top edge of the right side of the unit. The water trap bowl should be in a
vertical position on the inside of the case with the black tubing freely feeding directly into the
instrument and the electrical connector secured to the side panel. Check the tubing connection on the
bottom of the water trap bowl for cracks or tears, and be sure the top filter cap is secure.
Making the Connections
Using the standard sample line and pistol grip probe The sample line consists of a 15 foot 3 chamber
hose with connectors on each end. The connectors are sized to fit only in the correct receiver.
Connect one end of the sample line to the pistol grip probe. Please note the notched fitting on the
thermocouple connection that fits into the bottom of the pistol grip probe. This must be inserted
properly. Insert the Gas and Draft connectors into the proper receivers in the bottom of the pistol grip.
Next, connect the larger thermocouple connection to the front panel of the analyzer, then connect the
Gas and Draft lines.
Pressure Inlet
T-Gas Connection
Draft Inlet Gas Inlet
Serial Number Label
Power Cord &Fuse Tray
Sample Line & Probe
Peltier Gas Cooler & Particulate Filter