56
BUFFER TANK
1 PROBE
Buffer tank temperatura.
Maximum buffer tank temperature setpoint.
Demand ends.
Minimum buffer tank temperature setpoint.
Demand starts.
2 PROBES
Upper probe tank temperature.
Lower probe tank temperature.
Set temperature in top tank probe. Demand ends.
Set temperature in lower tank probe. Demand
starts.
DHW
1 PROBE
Tank temperature.
Maximum tank temperature setpoint. Demand
ends.
Minimum tank temperature setpoint. Demand
starts.
2 PROBES
Upper probe tank temperature.
Lower probe tank temperature.
Setpoint temp. Reached in lower tank probe.
Demand starts.
Setpoint temp. Reached in lower tank probe.
Demand starts.
Performs an anti-legionella cycle
Dissipation DHW
It dissipates the heat produced during the shutdown on
the DHW.
Boiler covering demand of DHW.
Boiler covering heating demand.
T1
ºC
T1
T2
ºC
ºC
T1
ºC
T1
T2
ºC
ºC
Summary of Contents for Eco I Insert
Page 1: ......
Page 22: ...21 Figura 47 Asignar plantilla deseada a d a de la semana Guardar programaci n IMPORTANTE...
Page 54: ...53 Drawing 47 Assign desired template to day of the week Save configuration IMPORTANT...
Page 150: ...149 Figura 47 Atribuir modelo desejado ao dia da semana Guardar programa o IMPORTANTE...