![ECOFOREST CS 2012/08 Installation And Maintenance Manual Download Page 115](http://html1.mh-extra.com/html/ecoforest/cs-2012-08/cs-2012-08_installation-and-maintenance-manual_2354337115.webp)
114
CONTROL OF THE REVISIONS AND ANNUAL MAINTENANCE.
In order to optimize the functioning of your boiler
ECOFOREST
it is necessary to carry out the operations of
maintenance detailed in chapter 5 of the instructions manual. Those that shall be done annually must be carried out
by an authorized technician. Contact your distributor so that he sends you the qualified personnel required. Consider
than in order not to lose the warranty of your boiler, you must carry out this annual maintenance and for it to
remain valid, the technician who carries it out must fill in, sign (or stamp) the following forms:
Name of technician:
Name of technician:
Date:
Date:
Clean heat exchanger pipes.
Clean heat exchanger pipes.
Clean fireplace.
Clean fireplace.
Dismantle extractor and clean collector of gas outlet.
Dismantle extractor and clean collector of gas outlet.
Clean gas outlet extractor.
Clean gas outlet extractor.
Replace extractor joints, both from socket and motor.
Replace extractor joints, both from socket and motor.
Clean gas outlet pipe and check it is in perfect condition
Clean gas outlet pipe and check it is in perfect condition
Make sure the burn pot isn’t bended nor broken.
Make sure the burn pot isn’t bended nor broken.
Check ashtray’s and door’s joint.
Check ashtray’s and door’s joint.
After cleaning, make sure the boiler operates correctly.
After cleaning, make sure the boiler operates correctly
If everything works properly, disconnect the boiler until
next use.
If everything works properly, disconnect the boiler until
next use.
Stamp or signature:
Stamp or signature:
Name of technician:
Name of technician:
Date:
Date:
Clean heat exchanger pipes.
Clean heat exchanger pipes.
Clean fireplace.
Clean fireplace.
Dismantle extractor and clean collector of gas outlet.
Dismantle extractor and clean collector of gas outlet.
Clean gas outlet extractor.
Clean gas outlet extractor.
Replace extractor joints, both from socket and motor.
Replace extractor joints, both from socket and motor.
Clean gas outlet pipe and check it is in perfect condition
Clean gas outlet pipe and check it is in perfect condition
Make sure the basket isn’t bended nor broken.
Make sure the basket isn’t bended nor broken.
Check ashtray’s and door’s joint.
Check ashtray’s and door’s joint.
After cleaning, make sure the boiler operates correctly.
After cleaning, make sure the boiler operates correctly
If everything works properly, disconnect the boiler until
next use.
If everything works properly, disconnect the boiler until
next use.
Stamp or signature:
Stamp or signature:
Summary of Contents for CS 2012/08
Page 1: ......
Page 6: ...5 1 ESPECIFICACIONES T CNICAS CANTINA SUPER CS 2012 08 HIDRO 24 HC 2015 HIDRO 16 HB 2015...
Page 27: ...26 1 TECHNICAL FEATURES CS 2012 08 HC 2015 HB 2015...
Page 48: ...47 1 SP CIFICATIONS TECHNIQUES CS 2012 08 HC 2015 HB 2015...
Page 70: ...69 1 SPECIFICHE TECNICHE CS 2012 08 HC 2015 HB 2015...
Page 92: ...91 1 ESPECIFICA ES T CNICAS CS 2012 08 HC 2015 HB 2015...
Page 113: ...112...