Installation instructions
25
3.14 - ASSEMBLING CASING
65-N / 85-N
fig. 24
Guide the burner plug through the side plate (pos. 9) on the
preferred side and secure the cable with the cable gland
supplied.
Fasten the plates (pos. 9) to the sides of the casing.
G) Fix the rear panel (pos. 11) with the specific self-threading
screws.
H) Fix the boiler data
plates to the side panel after having
degreased the relevant part with the specific solvent.
The plates are included in the document envelope.
Assembly sequence (Ref. fig. 24, 25)
A) Mount the insulation (pos. 1) of the boiler body and secure
the 2 edges with the elastic straps (pos. 2) supplied in the
accessory box, hooking them to the external fabric part of the
insulation.
B) Position the side panels (pos. 3 e 4) with the lower bend inside
the L-shaped profile at the base of the boiler body and hook
the upper part in the plate cuts.
To determine which is the right side and which is the left side,
refer to the cable gland plates (pos. 9): they must face the
front of the boiler.
C) Fasten the 4 screws (pos. 5) to the sides on the front.
D) Mount the junction panel of the 2 sides (pos. 7).
E) Rotate the cover of the panel board frontwards after having
removed the two screws on the side and insert the electric
inlet cables and the outlet probe capillaries through the slots
at the base.
Fit the panel board to the upper panel (pos. 8).
Fit the upper panel (pos. 8), complete with panel board, to
the two sides of the casing.
F) Insert the bulbs of the instruments in the conduits as indicated
in in fig. 25 and wire the panel board to the power line, to the
burner and to any pumps, etc.
Close the cover of the electric control board.