Eco SR BGX TS-61 G Assembly Instruction Manual Download Page 9

Standard mounting

Mounting with adaptor profile
Mount adaptor profiles acc. to mounting dimensions. Go ahead with mounting acc. to           .

Mounting with under-lintle angle
Mount under-lintle angle acc. to mounting dimensions. Go ahead with mounting acc. to           .

Screw on mounting profiles and mounting plates (optional) , if necessary cut in the door middle.

Fix the slide rail to the mounting profile. Move the slide rail of the active leaf in the direction of the arrow until it 
reaches the stop    . Tighten screws    . Important: do not yet tighten the screws of the passive leaf slide rail.

Preparation door closer: Mount arm as shown    . Close valves for closing speed    . Preload arms    .

Mount door closer.

Move the arm in the direction of the door by opening the valve for the closing speed    . Connect arm to sliding 
block    . Important: move slide rail of passive leaf towards the maximum direction of the sliding block    .

Close the valves for closing speed    . Open both door leafs    . By opening the passive leaf to approximately 40°, the 
slide rail will be moved into the final mounting position    . Tighten the screws    .

Move sliding block until stop    . Mount triggering angle at stop on the roll    . Important: maximum projection 
length of door frame is 2mm, otherwise use distance plates a or b. The maximum projection length of door frame 
with distance plates is 8mm, all other lengths on request.

Adjust closing speed, closing force, latching speed and back-check.

The maximum opening angle of the active leaf is 120°, of the passive leaf 115° depending on the constructional 
condition and the door thickness. In order to avoid damages on doors and / or door closers, please set a door stop at 
the maximum opening angle (active and passive leaf).

Determine dimension x acc. to drawing    . Cut to length the connection rod to dimension x-3mm and deburr the 
connection rod    . Put the connection sleeves over the connection rod    .

2

3

4

1a

1b

1c

5

7

6

10

11

13

13

12

9

8

Move connection rod towards both rod ends    . Put connection sleeves over the rod ends until stop     and tighten 
screws    .

Open both doors approx. 60°, active leaf has to remain open. Passive leaf closes. Active leaf is only allowed to close 
if the passive leaf reaches a closing angle of approx. 30°.

Determine dimension y acc. to drawing    . Cut to length the U-cover profile to dimension y-8mm and deburr the 
cover profile    . Attach cover profile to mounting profile    . Attach nylon clips    . Adjust and fix cover profile    .

Clip on U-Cover     and pinion cover    .

Assembly for active leaves on the left is described below. For active leaves on the right, please go on accordingly.

9/11

2

13

2

13

1

2

1

2

3

1

2

3

1

2

3

4

1

2

1

2

3

1

2

3

1

2

3

4

5

1

2

Montage-Anleitung

Assembly Instruction / Notice de montage 

Fax. 0(23 73) 92 76-70

Tel. 0(23 73) 92 76-0

Iserlohner Landstraße 89

ECO Schulte GmbH & Co. KG

SYSTEM T ECHNIK FÜR DIE TÜR

Menden

D-58706

www.eco-schulte.com

SR BGX mit / with / avec TS-61/51 G

Summary of Contents for SR BGX TS-61 G

Page 1: ... 80 30 25 X X 70 105mm Bohrungen für Mitnehmerklappe MK Basis 2 Drillings for panic flap MK Basis 2 MK Basis 2 Perçage pour entraineur à l ouverture 33920035420 Fax 0 23 73 92 76 70 Tel 0 23 73 92 76 0 Iserlohner Landstraße 89 ECO Schulte GmbH Co KG SYSTEM TECHNIK FÜR DIE TÜR Menden D 58706 www eco schulte com ECO Schulte GmbH Co KG Änderungen vorbehalten SR BGX mit TS 61G 51G MTS00 Index 420 Mont...

Page 2: ... panic flap MK Basis 2 MK Basis 2 Perçage pour entraineur à l ouverture Bohrungen für Mitnehmerklappe MK Basis 2 Drillings for panic flap MK Basis 2 MK Basis 2 Perçage pour entraineur à l ouverture Fax 0 23 73 92 76 70 Tel 0 23 73 92 76 0 Iserlohner Landstraße 89 ECO Schulte GmbH Co KG SYSTEM TECHNIK FÜR DIE TÜR Menden D 58706 www eco schulte com Montage Anleitung Assembly Instruction Notice de mo...

Page 3: ... for panic flap MK Basis 2 MK Basis 2 Perçage pour entraineur à l ouverture Bohrungen für Mitnehmerklappe MK Basis 2 Drillings for panic flap MK Basis 2 MK Basis 2 Perçage pour entraineur à l ouverture Fax 0 23 73 92 76 70 Tel 0 23 73 92 76 0 Iserlohner Landstraße 89 ECO Schulte GmbH Co KG SYSTEM TECHNIK FÜR DIE TÜR Menden D 58706 www eco schulte com Montage Anleitung Assembly Instruction Notice d...

Page 4: ...5 M6x20 M6x20 SW 2 5 SW 2 5 Fax 0 23 73 92 76 70 Tel 0 23 73 92 76 0 Iserlohner Landstraße 89 ECO Schulte GmbH Co KG SYSTEM TECHNIK FÜR DIE TÜR Menden D 58706 www eco schulte com Montage Anleitung Assembly Instruction Notice de montage SR BGX mit with avec TS 61 51 G ...

Page 5: ... SW 2 5 SW 2 5 SW 2 5 Fax 0 23 73 92 76 70 Tel 0 23 73 92 76 0 Iserlohner Landstraße 89 ECO Schulte GmbH Co KG SYSTEM TECHNIK FÜR DIE TÜR Menden D 58706 www eco schulte com Montage Anleitung Assembly Instruction Notice de montage SR BGX mit with avec TS 61 51 G ...

Page 6: ...andflügelgleitschiene anschrauben vor Ort After the end of adjustment of the sliding rail for inactive leaf mount the angle on the construction site Après la fin de l ajustement de la glissière pour vantail semi fixe montez l equerre sur le chantier Fax 0 23 73 92 76 70 Tel 0 23 73 92 76 0 Iserlohner Landstraße 89 ECO Schulte GmbH Co KG SYSTEM TECHNIK FÜR DIE TÜR Menden D 58706 www eco schulte com...

Page 7: ...tional test SR Test fonctionnel SR 3 Fax 0 23 73 92 76 70 Tel 0 23 73 92 76 0 Iserlohner Landstraße 89 ECO Schulte GmbH Co KG SYSTEM TECHNIK FÜR DIE TÜR Menden D 58706 www eco schulte com Montage Anleitung Assembly Instruction Notice de montage SR BGX mit with avec TS 61 51 G ...

Page 8: ...Stangenenden führen Die Verbindungsmuffen über die Stangenenden auf Anschlag schieben und Madenschrauben festziehen 1 2 11 Maß X gemäß Darstellung ermitteln Verbindungsstange auf entsprechendes Maß X 3mm ablängen und entgraten Verbindungsmuffen wie dargestellt auf die Verbindungsstange schieben U Cover und Ritzelabdeckung aufklippen 13 13 1 2 3 4 5 Maß Y gemäß Darstellung ermitteln Abdeckprofil au...

Page 9: ...gths on request Adjust closing speed closing force latching speed and back check The maximum opening angle of the active leaf is 120 of the passive leaf 115 depending on the constructional condition and the door thickness In order to avoid damages on doors and or door closers please set a door stop at the maximum opening angle active and passive leaf Determine dimension x acc to drawing Cut to len...

Page 10: ...e la glissière en butée Monter l équerre jusqu au rouleau Important Recouvrement maximum 2mm si plus utiliser les cales a 4mm ou b 8mm Au delà de 8mm de recouvrement nous consulter Régler la vitesse de fermeture l à coup final le frein à l ouverture et la force Selon les informations fournies et selon l épaisseur de la porte l angle d ouverture du vantail principal est de 120 115 pour le vantail s...

Page 11: ...n In case of non respect the guarantee is invalid This instruction is to be handed over to the operator by the fitter after assembly Impérativement utiliser la notice de montage fournie par le fabricant La mise en œuvre et le montage doivent être exécutés par du person nel qualifié Le non respect de ces règles annule catégoriquement tout droit de garantie Cette instruction est à remettre par le po...

Reviews: