© 2022
Step 1 of 10
Order #XXXXX
Locked layer contains
placeholder marks.
Hole for wire
management
Steps:
Refer to the CEI152 Frame Assembly general information page.
1) Install U-Channel to horizontal [5]. See
U-Channel Attachment
detail.
2) Assemble verticals [1-2], [3-4] together.
3) Connect vertical assemblies [1/2], [3/4] between horizontals [5,6].
4) Attach horizontal [7] between vertical assemblies [1/2], [3/4].
5) Install Base Plates [8] to bottom of horizontal [5], using bolts & wing nuts.
FRONT VIEW
Item
1
2
3
4
5
6
7
8
--
Qty.
1
1
1
1
1
1
1
2
1
Description
96”h CEI152 Vertical Extrusion
49.823”h CEI152 Vertical Extrusion
96”h CEI152 Vertical Extrusion
49.823”h CEI152 Vertical Extrusion
56”w CEI152 Horizontal Extrusion
56”w CEI152 Horizontal Extrusion
52.353” Z140 Horizontal Extrusion
8” x 22” Base Plate
U-Channel
When assembled
U-Channel Attachment
Slide V4 connectors into
top groove of horizontal
extrusion. Tighten set-
screws to secure.
Use bolts to connect
U-Channel to
horizontal.
V4
connector
bolts
set
screws
*
*
1
3
4
6
7
U-Channel
8
8
5
2
Backwall Assembly