7
3.2 TRANSPORT PROTECT LOCK
In order to protect the light, there is a protect lock; During the transport , the lock will closed
keeping the item in safety state.
3.3 ABOUT PACK STAGE
1. Before packed, make sure power is off, and wait for at least 20mins for cooling down.
2. Before clean the fixture, make sure X, Y axis protect lock closed.
3. After packed by plastic bag, high-lift the fixture with two handles besides the product. put
the product into the fly-case up-side-down.
4. After packed the product, put the accessory into the accessory case, then closed and lock the
fly-case.
5. Fly-case only up stacked two layers. Prohibited upside down
6. When packed with carton box, equipment should be put into the foam first, then set into a
carton, pay attention to the vertical position.
3.4 UNPACKING
Note: Before unpacking check the damage is whether due to the transportation or not, if you find any
such damage, please do not use this item, and contact with the dealer or manufacturer as soon as
possible.
1. Open the fly-case, and discover the inside plastic bag.
2. High-lift the product by two handles beside the bottom base and move it out.
3. Before power on, make sure you have opened the X, Y axis lock!
4. INSTALL STRANDARD
4.1 INSTALL LOCK
B200 can be placed on the stage, or mounted in an arbitrary direction of the truss. Two fast locks
system could fix the item easily
4.2 EQUIPMENT FIXED
1. Before installation must verify the fast lock is keep in good state, and can withstand at
least 10 times the weight of product. Verify that the building can withstand at least 10
times of the total weight of the product and accessory equipments.
2. Fix the hang fixture into the hole, which located on the base of the price.
Seize handle of fasteners, clockwise rotate 1/4 turn and lock. Installed other one fastener
in the same method.
3. Using the safety cable which can withstand 10 times the weight of the equipment.
4. Make sure the X,Y protect locks are opened, Verify that within 3 meters there is no
combustibles .