Eco-Smart SunTrackerTwo Manual Download Page 13

With the lower lens in place, lift the light well over the curb and allow it to slide down into place.

With the lower lens in place lift the light well 

he

d allo

it t slid do

 int pl

1

Light Well Assembly and Installation

4

3

2

1

8

7

Gently lower the bottom lens into place, and 
seal lens into place with double-sided foam 
tape or caulk.

On longer light wells, it is recommended that 
the bottom lens be put into place from inside 
the building after the light well is attached 
(this may require a lift).

6

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

Repeat this process with the remaining sections until all four sections are connected and 
you have an open ended box with an outward facing flange on the top and an inward 
facing flange at the bottom.

5

4

3

Check that the well fits snugly onto the 
top of the curb all the way around.

9

TOLL FREE:(888)329-2705   [email protected]   www.eco-smart.com

PAGE 3

Eco-$mart, Inc.

Summary of Contents for SunTrackerTwo

Page 1: ...CIRALIGHT INSTALLATION MANUAL Page 1 SunTrackerTwo Preparation Cutting Holes and Preparing Curbs T G I Or Truss Eco mart Inc TOLL FREE 888 329 2705 FAX 941 377 9460 info eco smart com...

Page 2: ...this process in each bay that is to contain next skylights 4 You can now proceed with cutting the holes in the roof making and using a 461 2 template can be very helpful 5 Cut away soft existing roofi...

Page 3: ...MADE CONTRACTOR WILL DETERMINE IF ADDITIONAL ROOF REINFORCING IS REQUIRED INDICATE SAME ON INSTALLATION DRAWING Template for Roof Openings TOLL FREE 888 329 2705 info eco smart com www eco smart com...

Page 4: ...l 4 All corners must be square 5 Curb should measure 65 3 4 across the inside diagonal inside corner to inside corner Building the Curb Please Note On a slanted roof the low side of the curb will need...

Page 5: ...dome light well and lenses Attachment of curbs should meet with all building codes and requirements If roof curbs require additional reinforcing at any opening such details will be indicated and must...

Page 6: ...TOLL FREE 888 329 2705 info eco smart com www eco smart com PAGE 6 Eco mart Inc...

Page 7: ...WITH LIGHT WELL LIGHT WELL CURBING INSULATION PER ENERGY CODE REQUIREMENTS FINISHED ROOF DIFFUSER LENS FLAT SKYLIGHT DOME CONTROL UNIT ASSEMBLY WITH SOLAR CELL MIRROR MIRROR BRACKET SKYLIGHT FRAME w F...

Page 8: ...not damaged by a sudden gust Remove Mirror from tray assembly 6 6 6 6 6 6 6 6 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Taking care so as not to bend the mirror peel off the protective tape from the re...

Page 9: ...lastic nuts to the bolts and hand tighten do not use a wrench Please note that the solar panel of the controller faces away from the mirror The blue controller is shipped in it s own box Tighten the s...

Page 10: ...s will allow the controller to charge properly IMPORTANT Once the controller mirror is in place care should be taken to not leave the unit unattended as long as it remains uncovered Wind can cause the...

Page 11: ...Assembly and Installation 1 3 This photo sequence is for one piece non adjustable light wells For two piece adjustables see end of manual Eco mart Inc TOLL FREE 888 329 2705 FAX 941 377 9460 info eco...

Page 12: ...uding into the space that the light well is to occupy If the sections come with pre attached double sided tape for connecting the light well together peel the outer cover off the tape of one section B...

Page 13: ...ells it is recommended that the bottom lens be put into place from inside the building after the light well is attached this may require a lift 6 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Repeat this...

Page 14: ...p When assembled you will have two open ended boxes Measure the correct distance from the top of the curb to where the well is to meet the drop ceiling Slide the upper section of the well non flange s...

Reviews: