![ECM Raffaello Megaline Technical Handbook Download Page 18](http://html1.mh-extra.com/html/ecm/raffaello-megaline/raffaello-megaline_technical-handbook_4016398018.webp)
Raffaello Megaline
Espresso Coffee Machine
Start up
We assume that the equipment has been properly installed according to local law and jurisdiction by
an ECM authorized and qualified technician and is ready for use.
Please proceed as follows:
One group Raffaello Megaline machines (Raffaello Megaline A 1 and S 1)
On/off switch on Raffaello Megaline A1 and S 1
Heater switch on Raffaello A 1 and S 1
Double pressare gauge. Shows boiler pressare
and pump pressare
1.
Turn on/off switch on. The control lamps “machine on” (fig. A-2) and “boiler filling”
(fig. A-3) will light. You’ll hear the pump filling automatically the machine’s boiler. When
control lamp “boiler filling” (fig. A-3) switches off, the boiler is filled.
2.
Now turn the heater switch on. Wait till the boiler pressure shown on the machine’s pressure
gauge (see above) has reached app. 0,9 bar. Now open one of the steam valves for a couple of
seconds and close it again. The boiler pressure shown will decrease. Please wait until machine
reaches again app. 0,9-1,1 bar. Now the equipment is ready to operate.
Specifications subject to change without notice.
18