
5
Operating duster
Operating duster
Filling chemical tank and control lever position
1. Close shutter assembly by setting control lever (A) down to
bottom position.
2. Fill tank with chemicals.
3. Secure tank cap firmly to avoid chemical leakage.
4. Make sure that shutter assembly is closed.
Adjusting discharge volume
$
NOTE
Be sure that shutter control lever is in the bottom position
before starting the engine.
Metering Rod Setting Positions, Type of Chemicals, Spray Methods
Metering Rod Setting Position
Type of Chemical, Spray Method
MAX Position
Dust/DL Dust Hose Spraying
Fertilizer Spraying
Position 3
3 Kilo Granule Spraying
Position 1
Dust/DL Dust Spray Tube Spraying
1 Kilo Granule Spraying
Granule :Diameter
φ3-5
Control lever Position
As an example, please refer following chart to a relation of con
-
trol lever opening (position) and discharge rate at the condition
of setting metering rod “3” position.
D
is
ch
ar
ge
R
at
e
Please adjust metering rod setting position according to the
type of pesticide used.
NJPLQ
Summary of Contents for MBAD-5810
Page 2: ......
Page 32: ...6 1Notas y contraportada MEMORANDO ...
Page 33: ...7 MEMORANDO ...
Page 35: ......