4.4 Connection diagram

L

= U1 = blue

Z

brown

N

= U2 = black

PE

green/yellow

TOP

gray

Item no. 13600-5-9970 · ENU · Change 265731 · Approved 2022-09-30 · Page 9 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for W6E500-CJ03-81

Page 1: ...lled operated maintained and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to...

Page 2: ...Parts lying on the guard grill or falling through the guard grill may be thrown out by the fan when in operation Never step on the guard grill or subject the guard grill to load Do not place any obje...

Page 3: ...oper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant op...

Page 4: ...s in mm 1 Direction of air flow A 2 Tightening torque 1 5 0 2 Nm 3 Cable diameter min 6 mm max 12 mm tightening torque 2 0 15 Nm Item no 13600 5 9970 ENU Change 265731 Approved 2022 09 30 Page 4 12 eb...

Page 5: ...rload protector TOP with basic insulation with cable Axial Protection class assignment I If a protective earth is connected by the customer This component for installation may have several local prote...

Page 6: ...ANGER Voltage on the device Electric shock Always connect a protective earth first Check the protective earth DANGER Faulty insulation Risk of fatal injury from electric shock Use only cables that mee...

Page 7: ...on the cable used This must be checked by the user 4 3 2 Connecting wires to terminals Remove the cap from the cable gland Only remove caps where cables are fed in Route the wire s not included in sc...

Page 8: ...thermal overload protectors to protect the devices Check to make sure that the thermal overload protector is correctly connected before each operation Failure to connect the thermal overload protecto...

Page 9: ...4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow TOP gray Item no 13600 5 9970 ENU Change 265731 Approved 2022 09 30 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mu...

Page 10: ...nt imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioni...

Page 11: ...the device immediately and replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If clean...

Page 12: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Reviews: