background image

Operating instructions

S8E630-AN01-01

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All measures have the unit mm.

1

Direction of air flow "V"

2

Tightening torque 0.8±0.15 Nm

3

Illustration without terminal box cover

4

Cable diameter: min. 6 mm, max. 12 mm; tightening torque: 2±0.3 Nm

Item no. 10933-5-9970 · Revision 71516 · Release 2010-11-02 · Page 4 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for S8E630-AN01-01

Page 1: ...y trained and authorised specialist personnel are permitted to transport unpack assemble operate or maintain the device or to use it in any other manner 1 3 Basic safety rules 1 1 3 Basic safety rules...

Page 2: ...oose items of clothing and jewellery could become entangled and pulled into the device You could be injured Do not wear any loose clothing or jewellery while working on rotating parts Protect long hai...

Page 3: ...imbalance e g caused by dirt deposits or icing Operation in medical equipment with a life sustaining or lifesaving function Operation with external vibrations Moving solids content in flow medium Pai...

Page 4: ...tion of air flow V 2 Tightening torque 0 8 0 15 Nm 3 Illustration without terminal box cover 4 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm Item no 10933 5 9970 Revision 71516 Release...

Page 5: ...top on request Condensate discharge holes Rotor side Operation mode S1 Motor bearing Ball bearing Touch current acc IEC 60990 measuring network Fig 4 TN system 3 5 mA Electrical leads Via terminal box...

Page 6: ...ads or wires Water enters at the cable end on the customers side and can damage the device Make sure that the cable end is connected in a dry environment Connect the device only to circuits that can b...

Page 7: ...nstalled lying flat cable routed as a water trap Fans installed in upright position When routing the cable ensure that the screwed cable glands are arranged at the bottom The cables must always be rou...

Page 8: ...ns 4 4 Connection screen L U1 blue Z brown N U2 black PE green yellow TOP grey Item no 10933 5 9970 Revision 71516 Release 2010 11 02 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfi...

Page 9: ...be carried out by ebm papst only The terminal box does not have to be opened for maintenance Do not perform any repairs on your device Return the device to ebm papst for repair or replacement WARNING...

Page 10: ...evice Check the device for damage to blades and housing Visual inspection At least every 6 months Replacement of the device Mounting the connection lines Visual inspection At least every 6 months Fast...

Reviews: