background image

Operating instructions

R3G400-AC32-71

Translation of the original operating instructions

Faulty connection

Isolate from supply,
correct connection;
see connection
diagram.

Thermal overload
protector activated

Allow motor to cool
off, locate and rectify
cause of error,
release restart lockout
if necessary

Motor/electronics
overtemperature

Deficient cooling

Improve cooling. Let
the device cool down.
To reset the error
message, switch off
the line voltage for at
least 25 s and then
switch it on again.

Ambient temperature
too high

Reduce the ambient
temperature.
Reset by reducing
control input to 0.

Impermissible point of
operation

Correct the operating
point. Let the device
cool down.

In the event of further malfunctions, contact ebm-papst.

6.1 Vibration testing

Checking of fan for mechanical vibration based on ISO 14694.
Recommendation: Every 6 months. Max. vibration severity is 3.5 mm/
s, measured at the motor fastening diameter on the motor support plate in
the direction of the motor axis of rotation and perpendicular to this.

Fig. 1: Example illustrating vibration measurement. The arrangement of
the sensors depends on the device concerned and the installation
situation.

6.2 Cleaning

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not clean the device using a water jet or high-pressure

cleaner.

→ Do not use any acid, alkali or solvent-basedcleaning

agents.

→ Do not use any pointed or sharp-edged objects for cleaning

6.3 Safety inspection

NOTE
High-voltage test

The integrated EMC filter has Y capacitors. The tripping current
is exceeded when AC testing voltage is applied.
→ Test the device with DC voltage when you perform the

legally required high-voltage test. The voltage to be used
corresponds to the peak value of the AC voltage required by
the standard.

What to check

How to check

How often

What action?

Contact
protection
cover for
intactness or
damage

Visual inspection At least every

6 months

Repair or
replacement of
device

Device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
device

Fastening the
cables

Visual inspection At least every

6 months

Fasten

Fastening the
protective earth
terminal

Visual inspection At least every

6 months

Fasten

Insulation of
cables for
damage

Visual inspection At least every

6 months

Replace cables

Impeller for
wear/deposits/
corrosion and
damage

Visual inspection At least every

6 months

Clean or
replace impeller

Abnormal
bearing noise

acoustic

At least every
6 months

Replace device

Vibration test

Vibration
measuring
device, start-up
or run-down
measurement

Recommended
every 6 months

Clean, re-
balance and if
necessary
replace impeller

6.4 Disposal

For ebm-papst, environmental protection and resource preservation are
top priority corporate goals.
ebm-papst operates an environmental management system which is
certified in accordance with ISO 14001 and rigorously implemented
around the world on the basis of German standards.
Right from the development stage, ecological design, technical safety
and health protection are fixed criteria.

Item no. 50976-5-9970 · ENU · Change 90549 · Approved 2017-03-17 · Page 10 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for R3G400-AC32-71

Page 1: ...ified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety...

Page 2: ...after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with th...

Page 3: ...ons Improper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Res...

Page 4: ...2 4013 not included in scope of delivery other inlet rings on request 2 Clearance for screw 8 10 mm 3 Cable AWG18 5 x crimped ferrules 4 Cable AWG 22 3 x crimped ferrules Item no 50976 5 9970 ENU Chan...

Page 5: ...mpeller material Sheet aluminum Number of blades 6 Direction of rotation Clockwise viewed toward rotor Degree of protection IP54 Insulation class B Moisture F Environmental H protection class F3 1 Ins...

Page 6: ...to the substructure Check the device for transport damage Damaged devices are not to be installed Install the undamaged device in accordance with your application CAUTION Possible damage to the devic...

Page 7: ...ctive earth symbol and a hole 4 2 2 Reactive currents Because of the EMC filter integrated for compliance with EMC limits interference emission and immunity to interference reactive currents can be me...

Page 8: ...ting instructions 4 4 Connection diagram Drawing preliminary Item no 50976 5 9970 ENU Change 90549 Approved 2017 03 17 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49 0...

Page 9: ...off the device for maintenance Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Disconnect the device from the power supply When...

Page 10: ...pping current is exceeded when AC testing voltage is applied Test the device with DC voltage when you perform the legally required high voltage test The voltage to be used corresponds to the peak valu...

Page 11: ...e mostly made of steel copper aluminum and plastic Metallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron...

Reviews: