background image

Operating instructions

R3G220-RY90-P1

Translation of the original operating instructions

4.5 Checking connections

;

Ensure isolation from supply (all phases).

;

Make sure a restart is impossible

;

Check the cables for proper fit.

4.6 Switching on the device

The device may only be switched on if it has been installed properly and
in accordance with its intended use, including the required safety
mechanisms and professional electrical hookup. This also applies for
devices which have already been equipped with plugs and terminals or
similar connectors by the customer.

WARNING
Hot motor housing

Risk of fire
→ Ensure that no combustible or flammable materials are

located close to the fan.

;

Before switching on, check the device for visible external damage
and make sure the protective devices are functional.

;

Check the fan's air flow paths for foreign matter and remove any
foreign matter found.

;

Apply the nominal supply voltage.

;

Start the device by changing the input signal.

NOTE
Damage to the device from vibration

Bearing damage, shorter service life
→ Low-vibration operation of the fan must be ensured over the

entire speed control range.

→ Severe vibration can arise for instance from inexpert

handling, transportation damage and resultant imbalance or
be caused by component or structural resonance.

→ Speed ranges with excessively high vibration levels and

possibly resonant frequencies must be determined in the
course of fan commissioning.

→ Either run through the resonant range as quickly as

possible with speed control or find another remedy.

→ Operation with excessively high vibration levels can

lead to premature failure.

4.7 Switching off the device

Switching off the device during operation:

;

Switch off the device via the control input.

;

Do not switch the motor (e.g. in cyclic operation) on and off via power
supply.

Switching off the device for maintenance:

;

Switch off the device via the control input.

;

Do not switch the motor (e.g. in cyclic operation) on and off via power
supply.

;

Disconnect the device from the power supply.

;

When disconnecting, be sure to disconnect the ground connection last.

5. MAINTENANCE, MALFUNCTIONS, POSSIBLE
CAUSES AND REMEDIES

Do not perform any repairs on your device. Send the device to ebm-
papst for repair or replacement.

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

CAUTION
If control voltage or a stored speed set value is applied,
the motor will restart automatically, e.g. after a power
failure.

Risk of injury
→ Keep out of the device’s danger zone.
→ When working on the device, switch off the line voltage

and ensure that it cannot be switched back on.

→ Wait until the device comes to a stop.
→ After working on the device, remove any tools or other

objects from the device.

If the device is out of use for some time, e.g. when in storage,
we recommend switching it on for at least two hours to allow
any condensation to evaporate and to move the bearings.

Malfunction/fault

Possible cause

Possible remedy

Impeller not
running smoothly

Imbalance in rotating
parts

Clean the device;
replace it if imbalance
persists after cleaning.
Make sure no
weight clips are
removed during
cleaning.

Motor not turning

Mechanical blockage

Switch off, isolate
from supply and
remove mechanical
blockage.

Line voltage faulty

Check line voltage,
restore power
supply, apply control
signal.

Faulty connection

Isolate from supply,
correct connection;
see connection
diagram.

Motor/electronics
overtemperature

Deficient cooling

Improve cooling. Let
the device cool down.
To reset the error
message, switch off
the line voltage for at
least 25 s and then
switch it on again.

Ambient temperature
too high

Reduce the ambient
temperature.
Reset by reducing
control input to 0.

Impermissible point of
operation

Correct the operating
point. Let the device
cool down.

Item no. 57069-5-9970 · ENU · Change 262073 · Approved 2022-10-04 · Page 9 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for R3G220-RY90-P1

Page 1: ...ed maintained and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform wor...

Page 2: ...ding measures have to be taken by the user NOTE Electrical or electromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanica...

Page 3: ...he device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibr...

Page 4: ...ole prepared for self tapping M4 screw max clearance for screw 8 mm 3 Tapping hole prepared for self tapping M4 screw max clearance for screw 10 mm 4 Cable halogen free railway application EN 45545 10...

Page 5: ...All dimensions in mm Inlet ring 09609 2 4013 not included in scope of delivery Item no 57069 5 9970 ENU Change 262073 Approved 2022 10 04 Page 5 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 M...

Page 6: ...tion and connection Conformity with standards EN 45545 2 HL3 EN 50155 EN 61373 Cat 1B Approval EAC Comment A prerequisite for operation is a Class 1 vehicle electrical system architecture according to...

Page 7: ...earth connection after switching off supply with multiple devices connected in parallel Electric shock risk of injury Ensure sufficient protection against accidental contact Before working on the ele...

Page 8: ...t rating 250 VAC 30 VDC max 2 A AC1 min 1 mA 5 VDC reinforced insulation on control interface side basic insulation on supply side in accordance with EN 50124 1 15 10 V red Fixed voltage output 10 VDC...

Page 9: ...ation on and off via power supply Disconnect the device from the power supply When disconnecting be sure to disconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIE...

Page 10: ...esource preservation are top priority corporate goals ebm papst operates an environmental management system which is certified in accordance with ISO 14001 and rigorously implemented around the world...

Page 11: ...ploying the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 57069 5 9970 ENU Change 262073 Approved 2022 10 04 Page 11 11 ebm papst Mulfinge...

Reviews: