Operating instructions
R2E190-RA18-96
Translation of the original operating instructions
4.4 Connection diagram
Note: High speed (step III); low speed (step I); the switch must interrupt the circuit on switching.
1
blue (N)
2
brown
3
yellow
4
Step 1 (white)
5
Step 2 (gray)
6
Step 3 (black)
7
L1
8
PE (green/yellow)
Item no. 16396-5-9970 · ENU · Change 100193 · Approved 2018-06-18 · Page 9 / 11
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com