background image

Operating instructions

R2E180-CG82-01

Translation of the original operating instructions

4.5 Connection diagram

1

Fan connection diagram

U1

blue

Z

brown

U2

black

PE

green/yellow

2

Hall IC circuit

2.1

Hall IC

2.2

red (+5 V)

2.3

white (out)

2.4

black (0 V)

Item no. 11125-5-9970 · ENU · Change 94079 · Approved 2017-10-26 · Page 8 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for R2E180-CG82-01

Page 1: ...ed by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installati...

Page 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating de...

Page 3: ...stationary systems Commissioning the built in component only after installation in the customer equipment Operating the device with all protective devices Following the operating instructions Imprope...

Page 4: ...ing All dimensions in mm 1 Cable silicone 4G 0 5 mm 4x crimped splices 2 Cable Raychem AWG24 3x crimped splices Item no 11125 5 9970 ENU Change 94079 Approved 2017 10 26 Page 4 10 ebm papst Mulfingen...

Page 5: ...th standards EN 60335 1 CE Approval EAC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions...

Page 6: ...irements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor m...

Page 7: ...has external leads Connect the cables according to your application When doing so observe Chapter 4 5 Connection diagram Item no 11125 5 9970 ENU Change 94079 Approved 2017 10 26 Page 7 10 ebm papst M...

Page 8: ...diagram U1 blue Z brown U2 black PE green yellow 2 Hall IC circuit 2 1 Hall IC 2 2 red 5 V 2 3 white out 2 4 black 0 V Item no 11125 5 9970 ENU Change 94079 Approved 2017 10 26 Page 8 10 ebm papst Mul...

Page 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Page 10: ...isposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassembly of the product must be performed...

Reviews: