background image

Operating instructions

G3G225-RI07-01

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Cable PVC AWG18
5x splice

2

Cable PVC AWG22
5x splice

3

Tapping hole prepared for self-tapping screw for fastening plastics (Remform) dia. 4 mm, screw-in depth max. 15 mm, torque is to be
determined on the basis of the screw.

4

5x sheet metal nut for thread EN ISO 1478-ST4.8 (max. screw length 16 mm plus thickness of mounting material)

5

Screw-on domes are only permissible for Flowgrid!

6

Connecting sleeve not suitable for installation with pipe clamps

Item no. 56999-5-9970 · ENU · Change 260698 · Approved 2022-07-01 · Page 4 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for G3G225-RI07-01

Page 1: ...specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associate...

Page 2: ...y that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accide...

Page 3: ...prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration...

Page 4: ...h max 15 mm torque is to be determined on the basis of the screw 4 5x sheet metal nut for thread EN ISO 1478 ST4 8 max screw length 16 mm plus thickness of mounting material 5 Screw on domes are only...

Page 5: ...hed with defined air duct components e g inlet rings The dimensions must be requested from ebm papst If other air conduction geometries are used on the installation side the ebm papst evaluation loses...

Page 6: ...ce emission According to EN 61000 6 4 industrial environment 4 CONNECTION AND STARTUP 4 1 Mechanical connection CAUTION Cutting and crushing hazard when removing blower from packaging Carefully remove...

Page 7: ...n the end application Depending on the installation situation it may be necessary to connect an additional protective earth conductor by way of the extra protective earth terminal provided on the devi...

Page 8: ...Fan device address 1 Max PWM 100 Min PWM 10 Save set value to EEPROM No Set value requirement Analog linear Direction of action parameter set 1 Positive heating Direction of action parameter set 2 Po...

Page 9: ...relay floating status contact common connection contact rating 250 VAC 2A AC1 min 10 mA basic insulation on supply side and reinforced insulation on control interface side 2 8 0 10V yellow Analog inpu...

Page 10: ...e g in cyclic operation on and off via power supply Disconnect the device from the power supply When disconnecting be sure to disconnect the ground connection last 5 INTEGRATED PROTECTIVE FEATURES The...

Page 11: ...contact ebm papst The fan is equipped with maintenance free ball bearings The lifetime lubrication of the ball bearings is designed for a service life of 40 000 hours If bearing replacement is necessa...

Page 12: ...num Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Onl...

Reviews: