
Operating instructions
D2E160-GL25-23
Translation of the original operating instructions
4.4 Connection diagram
Note: High speed (step III); low speed (step I); the switch must interrupt the circuit on switching.
1
= TOP = yellow
2
= TOP = yellow
3
brown
4
N = blue
5
Step I black 1/white
6
Step II black 2/gray
7
Step III black 3/black
8
L1
9
= PE = green/yellow
Item no. 13132-5-9970 · ENU · Change 202174 · Approved 2018-12-28 · Page 8 / 10
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com