background image

Operating instructions

A4E250-AE32-06

Translation of the original operating instructions

4.3.1 Cable routing

Water must be prevented from reaching the cable exit along the cable.

NOTE
Damage caused by moisture penetration.

Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable

glands, the cable should be routed in a U-shaped loop
wherever possible.# If this is not possible, a drip edge can
be produced by fitting a cable tie directly in front of the cable
gland for example.

Fans installed lying flat

Fig. 1: Fan installed lying flat, cable routed in a U-shaped loop.

Fans installed upright

Fig. 2: Cable routing for fans installed upright. The cables must always
be routed downward.

Item no. 13776-5-9970 · ENU · Change 96928 · Approved 2017-10-26 · Page 7 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A4E250-AE32-06

Page 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Page 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating de...

Page 3: ...ticular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operati...

Page 4: ...ll dimensions in mm 1 Direction of air flow A 2 Max clearance for screw 5 mm 3 Cable PVC 4G 0 5mm 4x crimped splices Item no 13776 5 9970 ENU Change 96928 Approved 2017 10 26 Page 4 10 ebm papst Mulfi...

Page 5: ...ormity with standards EN 60335 1 CE With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions con...

Page 6: ...h 4 2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run...

Page 7: ...e should be routed in a U shaped loop wherever possible If this is not possible a drip edge can be produced by fitting a cable tie directly in front of the cable gland for example Fans installed lying...

Page 8: ...uctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 13776 5 9970 ENU Change 96928 Approved 2017 10 26 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Page 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Page 10: ...the applicable country specific legal regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be...

Reviews: