3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "A"

2

Max. clearance for screw 10 mm

3

Cable PVC 4G 0.5 mm², 4x crimped splices

Item no. 10349-5-9970 · ENU · Change 205161 · Approved 2019-11-14 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A2E300-AP02-02

Page 1: ...ed and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1...

Page 2: ...he entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accidental con...

Page 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Page 4: ...l dimensions in mm 1 Direction of air flow A 2 Max clearance for screw 10 mm 3 Cable PVC 4G 0 5 mm 4x crimped splices Item no 10349 5 9970 ENU Change 205161 Approved 2019 11 14 Page 4 11 ebm papst Mul...

Page 5: ...ade material Sheet steel painted black Number of blades 5 Airflow direction A Direction of rotation Clockwise viewed toward rotor Degree of protection IP44 Insulation class F Moisture F Environmental...

Page 6: ...UTION Voltage The fan is a built in component and has no disconnecting switch Only connect the fan to circuits that can be switched off with an all pole disconnection switch When working on the fan se...

Page 7: ...quency drives an all pole sine filter protects the motor against high voltage transients that can destroy the coil insulation system and against harmful bearing currents Heating up of the motor when u...

Page 8: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 10349 5 9970 ENU Change 205161 Approved 2019 11 14 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Page 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Page 10: ...ng the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace cables Condensation drainage holes f...

Page 11: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...