background image

Operating instructions

A2D250-AA06-84

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "A"

2

Cable A03VV-F7G0.5

3

Max. clearance for screw 5 mm

4

Cable diameter min. 6 mm, max. 9 mm

Item no. 13424-5-9970 · ENU · Change 202174 · Approved 2018-12-27 · Page 4 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A2D250-AA06-84

Page 1: ...suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3...

Page 2: ...rking on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into...

Page 3: ...prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration...

Page 4: ...sions in mm 1 Direction of air flow A 2 Cable A03VV F7G0 5 3 Max clearance for screw 5 mm 4 Cable diameter min 6 mm max 9 mm Item no 13424 5 9970 ENU Change 202174 Approved 2018 12 27 Page 4 10 ebm pa...

Page 5: ...th standards EN 60335 1 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm pap...

Page 6: ...e device Make sure the end of the cable is connected in a dry environment Only connect the device to circuits that can be switched off with an all pole disconnection switch 4 2 1 Requirements Check wh...

Page 7: ...netrate into the terminal box if water is constantly present at the cable glands To prevent the constant accumulation of water at the cable glands the cable should be routed in a U shaped loop whereve...

Page 8: ...inal operating instructions 4 4 Connection diagram Item no 13424 5 9970 ENU Change 202174 Approved 2018 12 27 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49 0 7938 81...

Page 9: ...uickly as possible with speed control or find another remedy Operation with excessively high vibration levels can lead to premature failure 4 8 Switching off the device Disconnect the device from the...

Page 10: ...icable country specific legal regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded...

Reviews: