Operating instructions

K3G250-PR17-I5

Translation of the original operating instructions

Impeller running
roughly

Imbalance in rotating
parts

Clean the device; if
imbalance is still
evident after cleaning,
replace the device.
If you have
attached any weight
clips during cleaning,
make sure to remove
them afterwards.

Motor does not turn

Mechanical blockage

Switch off, de-
energise, and
remove mechanical
blockage.

Mains supply voltage
faulty

Check mains supply
voltage,
restore power
supply,
apply control signal.

Faulty connection

De-energise, correct
connection, see
connection diagram.

Overtemperature of
electronics/motor

Insufficient cooling

Improve cooling. Let
the device cool down.
To reset the error
message, switch off
the mains supply
voltage for a min. of
25 s and switch it on
again.

Thermal overload
protector responded

Allow motor to cool
off, locate and rectify
cause of error, if
necessary cancel
restart lock-out

Ambient temperature
too high

Reduce the ambient
temperature.
Reset by reducing
control input to 0.

Unacceptable
operating point

Correct the operating
point. Let the device
cool down.

If you have any other problems, contact ebm-papst.

6.1 Vibration test

Checking the fan for mechanical vibrations based on ISO 14694.
Recommendation: every 6 months. Maximum vibration severity is 3.5
mm/s measured at the motor’s fastening diameter on the motor support
plate towards and perpendicular to the motor’s axis of rotation.

Fig. 4: Example showing vibration measurement. Positioning of the
sensors will vary depending on the device and the circumstances of
installation.

6.2 Cleaning

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not use a high-pressure cleaner to clean the device.# Do

not use any acid, alkali or solvent-based cleaning agents.

→ Do not use any pointed or sharp-edged objects for cleaning

6.3 Safety test

NOTE
High-voltage test

The integrated EMC filter contains Y capacitors. Therefore, the
trigger current is exceeded when AC testing voltage is applied.
→ Test the device with DC voltage when you carry out the

high-voltage test required by law. The voltage to be used
corresponds to the peak value of the AC voltage required by
the standard.

What has to
be tested?

How to test?

Frequency

Which
measure?

Check the
protective
casing against
accidental
contact for
damage and to
ensure that it is
intact

Visual inspection At least every

6 months

Repair or
replacement of
the device

Check the
device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
the device

Mounting the
connection lines

Visual inspection At least every

6 months

Fasten

Check the
insulation of the
wires for damage

Visual inspection At least every

6 months

Replace wires

Item no. 54783-5-9970 · ENG · Revision 202174 · Release 2018-12-28 · Page 11 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for 3297699

Page 1: ...the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re evaluated...

Page 2: ...or electromagnetic interferences after integrating the device in installations on the customer s side Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Body...

Page 3: ...particularly prohibited and may cause hazards Operating the device with an imbalance e g caused by dirt deposits or icing Resonance mode operation with heavy vibrations These also include vibrations t...

Page 4: ...ue 1 8 0 3 Nm 2 Cable diameter min 6 mm max 10 mm tightening torque 1 8 0 3 Nm use the provided seal Cable diameter min 4 mm max 7 mm tightening torque 1 8 0 3 Nm 3 Tightening torque 1 5 0 2 Nm 4 Inle...

Page 5: ...easurement configuration 3 4 Technical features Mass 9 2 kg Size 250 mm Motor size 84 Surface of rotor Coated in black Material of terminal box PP plastic Material of electronics housing Die cast alum...

Page 6: ...es and cut resistant safety gloves NOTE Damage to device from vibration Bearing damage reduced service life Forces or impermissibly high vibration levels must not be transmitted to the fan from system...

Page 7: ...erference emission and interference immunity idle currents in the mains cable can be measured even when the motor is at a standstill and the mains voltage is switched on The values are typically in th...

Page 8: ...ng flat cable routed in a U shaped loop When routing the cable ensure that the screwed cable glands are arranged at the bottom The cables must always be routed downwards Fig 3 Cable routing for fans i...

Page 9: ...ommon connection contact rating 250 VAC 2 A AC1 min 10 mA basic insulation on mains side and reinforced insulation on control interface side 8 GND Signal ground for control interface SELV 9 RSA RS 485...

Page 10: ...ice via the control input Do not switch the motor e g in cyclic operation on and off via power supply Switching off the device for maintenance work Switch off the device via the control input Do not s...

Page 11: ...plate towards and perpendicular to the motor s axis of rotation Fig 4 Example showing vibration measurement Positioning of the sensors will vary depending on the device and the circumstances of insta...

Page 12: ...is to be disassembled into suitable components for disposal employing standard procedures for motors WARNING Heavy parts of the product may drop off Some of the product components are heavy These comp...

Reviews: