382
2. HYDRAULIC INSTALLATION (DIFFERENTIAL PRESSURE)
TECHNICAL DATA
OPTION A: 2 PRESSURE SENSORS
OPTION B: 1 DIFFERENTIAL PRESSURE SENSOR
Figure 2
*Note:
For Option A, connect discharge side sensor to 4-20mA (1) and suction side sensor to 4-20mA (2).
1. HYDRAULIC INSTALLATION (CONSTANT PRESSURE)
1: Pump
2: E-SPD+ Device
3: Gate valve
4: Pressure transducer
5: Non return valve
6: Pressure tank
7: Drain off valve
INFO
LEGEND
For correct operation of the pressurization system, we recommend the use small size pressure tank. It is necessary to stabilize any pressure
fluctuations during the variation frequency of the inverter.
Pay attention to the calculation for pre-charge of the pressure tank. In case of changes in the reference pressure, the pre-charge of the tank must
be adjusted according to the calculation.
Pp = Pre-charge pressure
Ps = Setpoint pressure
Dr = Delta restart pressure
Pp = (Ps – Dr) – 0,5 bar
Figure 1
Summary of Contents for E-SPD MT 2200
Page 2: ......
Page 40: ......
Page 78: ......
Page 116: ......
Page 154: ......
Page 192: ......
Page 230: ......
Page 268: ......
Page 306: ......
Page 344: ......
Page 391: ......
Page 392: ...392 7 SCHEMATIC DIAGRAM TT 11000 2 3 4 12 1 13 11b 11a 11b 7 9 15 14 8 17 5 6 16 10 ...
Page 395: ......