EBARA DDLFU Operating Instructions, Installation & Maintenance Manual Download Page 3

EBARA Submersible Sewage Pumps

DDLFU/DDLFMU

 

Instruction Manual 

EBARA

 Pumps Americas Corporation 

www.pumpsebara.com

(803) 327-5005  •  (803) 327-5097 

(fax)

rev. 04/19

Installation 

1.   Check the following before beginning installation: 

 
 

 

 
 
 

 
 
 
 
 
 
 
 
Insulation resistance measurement: 
(1) For three phase motor: 

     Excluding the power supply connections, use a meggar to measure the insulation resistance between the ground wire  
     and each phase of the motor.

Pump Checks 

1.   Check the following points upon receipt of 

     your pump:

 

(1) Check the name plate to confirm that it is the pump  

     ordered.  

(2) Ensure that the pump voltage is the same as the power  

     at your location.  

(3) Check oil level at oil plug. 
(4) Check that all plugs and fastening bolts are properly  

     tightened.  

(5) Check that the pump has not been damaged and the  

     cable glands and cables are in satisfactory condition.  

(6) Check accessories and spare parts against the packing  

     list. 

(7) Check that the impeller turns smoothly by hand.

 

2.  Precautions when operation is suspended:

 

(1) If operation is to be suspended for 30 days with the pump  

     immersed in water, measure the insulation resistance of  
     the motor. 
     If resistance is over 1 mega ohm, operate pump to prevent  
     rust from developing on moving parts. Follow the instructions  
     under OPERATION when pump operation is to be resumed. 

(2) For dry storage, clean out pump and store in a dry place.  

     Follow the instructions under INSTALLATION and OPERATION  
     when pump operation is to be resumed. 

WARNING 

Before insulation resistance measurement, always disconnect the power first. 
 
All electrical work should be performed by a qualified electrician and all national and local electrical codes must 
be observed.

CAUTION 

When measuring the insulation resistance with meggar for motor windings do not test overload protection. 
  
MINIATURE THERMAL PROTECTION (MTP) AND LEAKAGE DETECTOR (LD) ARE USED FOR MOTOR PROTECTION. 
MTP AND LD CABLES MUST BE INSTALLED IN CONTROL CIRCUIT.

CAUTION 

Measure the insulation resistance. The value should be more than 1 mega ohm. While making the measurement, keep the 
power supply cable off the ground.

Summary of Contents for DDLFU

Page 1: ...Submersible Dry Pit Non clog Water Wastewater Pump Model DDLFU Model DDLFMU Operating Instructions Installation Maintenance Manual EBARA Pumps Americas Corporation...

Page 2: ...ion WARNING Before handling this pump always disconnect the power first Do not use sparkable electrical devices or flames in a septic gaseous or possible septic sump Do not work under heavy suspended...

Page 3: ...hly by hand 2 Precautions when operation is suspended 1 If operation is to be suspended for 30 days with the pump immersed in water measure the insulation resistance of the motor If resistance is over...

Page 4: ...evelop 5 Do no operate the pump for a long time with the water level near the minimum operating level as the automatic cut off switch incorporated inside the motor will be activated To avoid dry opera...

Page 5: ...the pump Make sure all electrical connections are secure Output 15 to 30HP 208 230V 460V WARNING Check that the power is locked off and disconnected before working on pump All electrical work should b...

Page 6: ...pumpsebara com 6 803 327 5005 803 327 5097 fax rev 04 19 Output 40 to 60HP 208 230V 460V G GRN L1 RED T1 T7 L2 WHT T2 T8 L3 BLK T3 T9 L5 WHT T4 T10 L6 BLK T5 T11 L4 RED T6 T12 P1 RED P2 WHT P3 BLK P4...

Page 7: ...otector will be activated Constant repetition of this action will shorten pump service life Do not start the pump again in such a situation until after the motor has completely cooled 2 Test Operation...

Page 8: ...ive mechanical seal requiring replacement The service life of the mechanical seal can be prolonged by replacing the oil in the mechanical seal chamber once a year When replacing the oil lay the pump o...

Page 9: ...e has activated motor protector 2 Lower liquid temperature and caused pump to stop Does not pump 1 Reverse rotation 1 Correct rotation see Operation 2 3 Inadequate volume 2 Significant drop in voltage...

Page 10: ...6 3 6 6 PART NO 120 11 125 167 174 193 1 193 2 193 3 193 4 193 5 193 6 200 801 802 811 1 811 2 814 816 1 816 2 817 830 831 838 1 838 2 849 1 849 2 876 909 924 1 924 2 PART NAME BOLT BOLT SUCTION ELBOW...

Page 11: ...8 8 4 6 6 3 8 8 PART NO 120 10 125 167 174 193 1 193 2 193 3 193 4 193 5 193 6 200 801 802 811 1 811 2 814 816 1 816 2 817 830 831 838 1 838 2 849 1 849 2 876 909 924 1 924 2 PART NAME BOLT BOLT SUCT...

Page 12: ...304 AISI304 NO FOR 1 UNIT 1 1 1 1 1 1 1 1 SET 1 1 1 1 1 1 1 1 2 1 1 1 2 12 4 8 4 8 8 4 6 PART NO 120 10 120 11 125 167 174 193 1 193 2 193 3 193 4 193 5 200 801 802 811 1 811 2 814 816 1 816 2 817 830...

Page 13: ...AISI304 AISI304 AISI304 AISI304 NO FOR 1 UNIT 1 1 1 1 1 1 1 SET 1 1 1 1 1 1 1 1 2 1 1 1 12 4 8 4 8 4 8 6 8 PART NO 120 10 125 167 174 193 1 193 2 193 3 193 4 200 801 802 811 1 811 2 814 816 1 816 2 8...

Page 14: ...MTP which are embedded in the windings When temperature of the winding raises and reaches the MTP acting point the motor protection circuit is activated to protect motor from over heat 1 Applicable mo...

Page 15: ...ry reed switch encapsulated within a stem The switch opens on rise of liquid 2 Specifications Apply to 2 to 30HP Breaking Capacity AC50VA DC50W Max Breaking Current AC0 5A DC0 5A Max Operating Voltage...

Page 16: ...rtation shall be borne by the Purchaser No allowance will be made for repairs without EPAC s written consent or approval and the Warranty Period shall not be suspended upon stopping operation for warr...

Page 17: ...re information about other EBARA products EBARA Pumps Americas Corporation 1651 Cedar Line Drive Rock Hill SC 29730 803 327 5005 t 803 327 5097 f www pumpsebara com 2018 EBARA Pumps Americas Corporati...

Reviews: