KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01 Page 5 of 29
1. Bring in the first pallet of four KF760s and position it under the chain motors.
2. Lower the chain motors for attachment ot the Fly-Bar Hoist Rings.
3. If the Fly-Bar was transported attached to palleted KF760s then attach the chain motors to the Fly-Bar
and skip the next steps.
4. If the Fly-Bar was transported un-attached from a KF760 pallet then attach the chain motors to the
assembled Fly-Bar and perform the next two steps (not shown):
1. Land the Fly-Bar on top enclosures so the weight is off the chain motors.