KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01 Page 28 of 29
4. Connect the bottom KF760 to the pallet at all four corners by lifting the hinges on the pallets Hinge
Tubes into each enclosure Hinge Tube and secure each with a connecting pin. The connecting pins for
this should have been stored in the bottom of the KF760 (see section 2.4.4 step 7).
5. Check for and remove any hinge locking pins from the rear Hinge Tubes and put aside for loose
storage.
2.4.6
Fly-Bar
Fly-Bar Stays with Enclosures:
1. If not already done, lock the four hinges of the top enclosure in their fully extended (up) position. Do
this by inserting a short connecting pin into the topmost holes on each of the four Hinge Tubes of the
topmost enclosure.
2. Bump in the chain motors so the hoist rings are slack . Disconnect the chain motors from the Fly-Bar.
3. Fly out the chain motors and move the palleted KF760s aside.
4. The loaded pallets are ready for transport.
Fly-Bar Removed from Enclosures (not shown):